前言:一篇好文章的誕生,需要你不斷地搜集資料、整理思路,本站小編為你收集了豐富的消防工程施工及驗(yàn)收規(guī)范主題范文,僅供參考,歡迎閱讀并收藏。
關(guān)鍵詞:消防安裝, 試驗(yàn),施工驗(yàn)收
Abstract: the construction of fire control facilities is an essential building construction and installation. Along with the development of construction industry, the degree of fire safety, reliability put forward higher request. The quality of the construction quality, the direct impact on the normal operation of the facilities of the fire. From daily construction quality supervision and inspection and acceptance of work situation, the construction process still has some problems, and combined with engineering specific installation construction process the actual situation, the construction process of building fire installation some problems in the analysis, and put forward the corresponding technical measures to solve the problems in the process of installation of trival, improving engineering installation quality, ensure security.
Keywords: fire installation, test, construction inspection
中圖分類號(hào):TU74文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):
1、消防安裝
隨著我國(guó)消防法的不斷深入貫徹, 我國(guó)建筑市場(chǎng)的競(jìng)爭(zhēng)規(guī)則 、技術(shù)標(biāo)準(zhǔn) 、經(jīng)營(yíng)方式 ,服務(wù)模式都將進(jìn)一步與國(guó)際接軌, 在建筑市場(chǎng)的影響下, 現(xiàn)代化的廠房對(duì)安全功能, 尤其是消防設(shè)施的安裝工程質(zhì)量要求也越來越高, 但現(xiàn)實(shí)是消防設(shè)施尤其是消防管道的安裝是在土建等主體工程完成后方可進(jìn)行, 而此時(shí)電氣安裝工程 ,設(shè)備安裝工程也在搶工期, 當(dāng)消防管道安裝與其他安裝工程發(fā)生沖突時(shí), 必會(huì)為其他搶工期 保生產(chǎn)的工程讓路, 這就給消防安裝質(zhì)量帶來了隱患。
2、安裝及實(shí)驗(yàn)
下面就建筑消防安裝施工過程中所產(chǎn)生的若干問題進(jìn)行了分析,建設(shè)部頒發(fā)的自動(dòng)噴水滅火系統(tǒng)施工及驗(yàn)收規(guī)范中規(guī)定:管網(wǎng)安, 當(dāng)管子公稱直徑小于或等于100 mm 時(shí), 應(yīng)采用螺紋連接, 當(dāng)管子公稱直徑大于 100 mm 時(shí), 可采用焊接或法蘭連接通過多年實(shí)踐, 對(duì)標(biāo)準(zhǔn)進(jìn)行了修定, 于2005 年5 月16 日頒發(fā)了GB50261- 2005 自動(dòng)噴水滅火系統(tǒng)施工及驗(yàn)收規(guī)范確定于2005 年7 月1 日實(shí)施, 在規(guī)范第5. 1. 2 條指出應(yīng)采用螺紋溝槽式管件或法蘭連接, 因?yàn)閺墓こ虒?shí)踐證明, 消防管道焊接的接口處容易發(fā)生銹蝕, 產(chǎn)生的氧化鐵脫落后極易堵塞管道和噴頭, 影響系統(tǒng)的正常使用。 管道采用螺紋溝槽式管件或法蘭連接安裝簡(jiǎn)便, 工期短, 并且能確保工程質(zhì)量, 同時(shí)在使用過程中的維修管理也帶來方便。 但由于多年來, 工程人員已習(xí)慣了而且焊接工藝施工簡(jiǎn)單, 初期造價(jià)低, 從而造成工程施工中極易出現(xiàn)消防管道焊接現(xiàn)象, 消防工程是百年大計(jì), 因此要從設(shè)計(jì)消防管道的焊接工藝,質(zhì)檢、 消防驗(yàn)收等多方位加強(qiáng)管理, 確保從根本上杜絕消防管道的焊接現(xiàn)象在消防供水設(shè)施安裝中也存在著一些問題。 在 GB 50261-2005 自動(dòng)噴水滅火系統(tǒng)施工及驗(yàn)收規(guī)范中,第 4 章規(guī)定消防水泵的出水管上應(yīng)安裝止回閥 ,控制閥和壓力表, 系統(tǒng)的總出水管上還應(yīng)安裝壓力表和泄壓閥; 安裝壓力表時(shí)應(yīng)加緩沖裝置 壓力表和緩沖裝置之間應(yīng)安裝旋塞、 消防水池 、消防水箱的溢流管, 泄水管不得與生產(chǎn)或生活用水的排水系統(tǒng)直接相連, 應(yīng)采用間接排水方式, 而在施工時(shí)經(jīng)常忽視消防用水與其他用水合并的水箱不能作為他用的技術(shù)設(shè)施, 以及不設(shè)置止回閥 ,不設(shè)置緩沖裝置不按規(guī)范要求保證消防水箱應(yīng)儲(chǔ)存10 min 的消防用量, 導(dǎo)致無法確保消防系統(tǒng)的正常使用。
3、質(zhì)量管理
在 GB 50261- 2005 自動(dòng)噴水滅火系統(tǒng)施工及驗(yàn)收規(guī)范中第6 章強(qiáng)制性條文規(guī)定, 管網(wǎng)安裝完畢后, 應(yīng)對(duì)其進(jìn)行強(qiáng)度試驗(yàn)嚴(yán)密性試驗(yàn)和沖洗 ,即管網(wǎng)試壓分強(qiáng)度和嚴(yán)密性兩步進(jìn)行, 當(dāng)系統(tǒng)設(shè)計(jì)工作壓力等于或小于1. 0 MPa 時(shí), 水壓強(qiáng)度試驗(yàn)壓力應(yīng)為設(shè)計(jì)工作壓力的1. 5 倍, 并不低于1. 4 MPa; 當(dāng)系統(tǒng)設(shè)計(jì)工作壓力大于 1. 0 MPa 時(shí), 水壓強(qiáng)度試驗(yàn)壓力應(yīng)為該工作壓力加0. 4 MPa 水壓嚴(yán)密性試驗(yàn)應(yīng)在水壓強(qiáng)度試驗(yàn)和管網(wǎng)沖洗合格后進(jìn)行, 試驗(yàn)壓力為設(shè)計(jì)工作壓力。 目前, 有些工地為搶工期, 只對(duì)管網(wǎng)進(jìn)行水壓嚴(yán)密性試驗(yàn)或者強(qiáng)度試驗(yàn)壓力也不符合設(shè)計(jì)和范要求, 這就給系統(tǒng)的正常生產(chǎn)運(yùn)行帶來了隱患。如果消防工程專業(yè)施工企業(yè)的主要技術(shù)負(fù)責(zé)人或現(xiàn)場(chǎng)施工負(fù)規(guī)責(zé)人員,對(duì)整個(gè)工程防災(zāi)系統(tǒng)邏輯功能不具備全面清楚的理解把握, 而土建總包方技術(shù)負(fù)責(zé)人又不清楚這些消防安裝工程, 往往造成工程最后階段遲遲調(diào)試不完, 甚至驗(yàn)收不合格的被動(dòng)局面有鑒于此, 施工企業(yè)應(yīng)當(dāng)從多方面加強(qiáng)消防工程的施工質(zhì)量管理:
(1) 要對(duì)工程中使用的消防產(chǎn)品和輔助產(chǎn)品 材料進(jìn)行復(fù)核查驗(yàn), 做好記錄, 不合格的決不能使用 切實(shí)做到正確的符合規(guī)范要求的安裝施工。
(2) 施工單位應(yīng)協(xié)助建設(shè)單位, 設(shè)計(jì)單位, 完善設(shè)計(jì)圖紙, 特別是防排煙正壓送風(fēng), 事故電源切換, 應(yīng)急廣播, 電梯迫降, 防火分區(qū)的劃分等部分設(shè)計(jì)是否滿足, 高規(guī)、建規(guī) 及相關(guān)消防設(shè)計(jì)規(guī)范 抓住了基礎(chǔ)工作, 把握了關(guān)鍵, 才能保證整個(gè)工程中防災(zāi)系統(tǒng)施工順利, 達(dá)到一次調(diào)試成功驗(yàn)收通過。
(3) 工程質(zhì)量關(guān)系到防火滅火的成敗, 因此消防工程施工必須嚴(yán)格按照消防設(shè)計(jì)、 施工和驗(yàn)收規(guī)范進(jìn)行施工。 事實(shí)證明, 如果忽略了安裝方面的質(zhì)量要求, 往往導(dǎo)致驗(yàn)收雖然通過了, 但系統(tǒng)運(yùn)行不可靠, 甚至發(fā)生強(qiáng)行進(jìn)入系統(tǒng)燒毀設(shè)備的嚴(yán)重事故, 這也是缺少整合能力的表現(xiàn)。
實(shí)踐證明, 建筑消防安裝工程中出現(xiàn)的工程質(zhì)量問題, 主要
是由于施工單位只過重注重經(jīng)濟(jì)效益, 對(duì)消防安裝規(guī)范學(xué)習(xí)和設(shè)
施的監(jiān)測(cè)缺少足夠的認(rèn)識(shí)和投入所造成的, 只有及時(shí)跟蹤建筑消
防施工過程, 堅(jiān)決杜絕違反消防技術(shù)規(guī)范施工的現(xiàn)象出現(xiàn), 才能
確保建筑消防安裝工程質(zhì)量。建筑消防的正常生產(chǎn)運(yùn)行和使用是安全生產(chǎn)的重要保證, 只有規(guī)范工程施工作業(yè), 嚴(yán)格按照各項(xiàng)規(guī)程施工, 才能確保消防安裝工程質(zhì)量, 保證消防設(shè)施在關(guān)鍵時(shí)期發(fā)揮關(guān)鍵作用。
4、驗(yàn)收的程序
消防驗(yàn)收的目的是,檢查工程竣工后其消防設(shè)施配置,是否符合已獲審核批準(zhǔn)的消防設(shè)計(jì)的要求。 驗(yàn)收的組織主持者是公安消防機(jī)構(gòu), 驗(yàn)收的申報(bào)者是工程的建設(shè)單位 。驗(yàn)收的結(jié)果是判定工程是否可以投入使用或生產(chǎn)。 或者需要進(jìn)行必要的整改 ,驗(yàn)收的順序通常為驗(yàn)收受理?,F(xiàn)場(chǎng)檢查, 現(xiàn)場(chǎng)驗(yàn)收。
評(píng)定和工程移交等階段,驗(yàn)收階段應(yīng)注意的問題,消防驗(yàn)收是綜合性強(qiáng) ,須各個(gè)專業(yè)都達(dá)到驗(yàn)收條件,方可進(jìn)行, 因此消防驗(yàn)收是一項(xiàng)復(fù)雜而細(xì)致的工作, 土建專業(yè)、防火門、 防火卷簾必須安裝就位 ,消防道路必須鋪設(shè)完成 ,安裝專業(yè)須通過建筑物的消防電氣檢測(cè) 應(yīng)急燈符合消防要求,照明與動(dòng)力電切換正常, 消防專業(yè)須通過自動(dòng)消防設(shè)施檢測(cè)。
室外消火栓,、水泵接合器也必須安裝就位, 但建筑物竣工時(shí)外網(wǎng)工程,往往會(huì)相對(duì)的滯后或正處于施工階段, 若要保證驗(yàn)收的順利進(jìn)行, 自來水外網(wǎng)工程應(yīng)及時(shí)完成 ,以滿足消防驗(yàn)收時(shí)的用水需要, 保證室外消火栓的安裝就位, 同時(shí)室外水泵接合器的安裝也要保證在驗(yàn)收前完成, 且做好要的成品保護(hù)工作 ,避免其他管線施工造成破壞。
5、結(jié)語(yǔ)
施工企業(yè)應(yīng)將, 以人為本、 安全第一作為理念, 嚴(yán)格按照國(guó)
家規(guī)范和現(xiàn)行標(biāo)準(zhǔn)及有關(guān)規(guī)定施工,保證消防設(shè)施的正常使用。
參考文獻(xiàn):
[ 1] 馬致遠(yuǎn),張磊.淺談高層建筑消防電氣設(shè)計(jì)中的幾個(gè)問題
關(guān)鍵詞:消防系統(tǒng);布線;規(guī)范;問題
一 概述
消防系統(tǒng)布線作為消防設(shè)施系統(tǒng)的重要組成部分,在火災(zāi)探測(cè)、人員疏散、火災(zāi)撲救中起著至關(guān)重要的作用。消防布線的作用如同人體血管一樣,在各個(gè)消防系統(tǒng)中起著信號(hào)傳輸?shù)闹匾饔谩O老到y(tǒng)布線工程是消防電氣工程的重要組成部分,為了保證消防電氣工程的施工質(zhì)量,確保消防工程的正常運(yùn)作,系統(tǒng)布線應(yīng)符合現(xiàn)行GB 50016-98《火災(zāi)自動(dòng)報(bào)警系統(tǒng)設(shè)計(jì)規(guī)范》、GB 50166-2007《火災(zāi)自動(dòng)報(bào)警系統(tǒng)施工及驗(yàn)收規(guī)范》、GB 50303-2002《建筑電氣工程施工質(zhì)量驗(yàn)收規(guī)范》等有關(guān)國(guó)家標(biāo)準(zhǔn)和技術(shù)規(guī)范。
二 系統(tǒng)布線的一般要求
消防工程系統(tǒng)布線不僅要求安全可靠,而且要求線路布局合理、整齊、美觀、節(jié)約。具體要求如下:
1 導(dǎo)線電壓級(jí)別的要求。為保證系統(tǒng)導(dǎo)線有足夠的電氣強(qiáng)度,導(dǎo)線應(yīng)采用銅芯絕緣導(dǎo)線或銅芯電纜,額定工作電壓50V以下線路,應(yīng)采用電壓等級(jí)不低于250V的導(dǎo)線;額定工作電壓為220/380V時(shí),應(yīng)采用電壓級(jí)別不低于500V的導(dǎo)線。
2 線路線芯截面積的要求。系統(tǒng)傳輸線路除了要滿足系統(tǒng)裝置技術(shù)條件要求外,還應(yīng)滿足機(jī)械強(qiáng)度要求。穿管敷設(shè)的絕緣導(dǎo)線,其線芯最小面積不應(yīng)小于1mm2;線槽內(nèi)敷設(shè)的絕緣導(dǎo)線,其線芯最小面積不應(yīng)小于0.75mm2;多芯電纜截面積不應(yīng)小于0.5 mm2。
3 導(dǎo)線顏色要求。為方便系統(tǒng)的安裝調(diào)試和安裝,同一工程中的導(dǎo)線,應(yīng)根據(jù)不同用途選擇不同顏色加以區(qū)分,相同用途的導(dǎo)線顏色應(yīng)一致。電源線正極應(yīng)為紅色,負(fù)極應(yīng)為藍(lán)色或黑色。
4 導(dǎo)線連接的要求。實(shí)踐證明,因管內(nèi)或槽內(nèi)有接頭將影響線路的機(jī)械強(qiáng)度,另外有接頭也是故障的隱患點(diǎn),不利于進(jìn)行檢查,故導(dǎo)線在線管內(nèi)或線槽內(nèi),不應(yīng)有接頭或扭結(jié)現(xiàn)象,導(dǎo)線的接頭應(yīng)在接線盒內(nèi)焊接或用接線端子連接。
5 建筑物變形縫的布線要求。為保證線路不因建筑物振動(dòng)而導(dǎo)致線路斷裂,提高系統(tǒng)穩(wěn)定性,管線經(jīng)過建筑物的變形縫(沉降縫、伸縮縫、抗震縫等)處時(shí),應(yīng)采取補(bǔ)償措施,導(dǎo)線跨越變形縫的兩側(cè)應(yīng)固定,并留有適當(dāng)余量。
6 絕緣性能要求。為保證系統(tǒng)線路導(dǎo)線的絕緣性能和安裝質(zhì)量,系統(tǒng)布線安裝完畢后,每回路的導(dǎo)線對(duì)地的絕緣電阻應(yīng)不小于20MΩ。
7 吊裝線路的固定要求。為增加機(jī)械強(qiáng)度,防止弧垂過大,確保工程質(zhì)量,明裝設(shè)各類管路和線槽時(shí),應(yīng)采用單獨(dú)的卡具吊裝或支撐物固定,吊裝線槽的吊桿直徑不小于6mm,吊點(diǎn)或支點(diǎn)的距離要求應(yīng)符合規(guī)范要求。
8 頂棚布線的要求。為防止受到火災(zāi)影響,建筑物頂棚內(nèi)布線時(shí),應(yīng)采用金屬管或金屬線槽布線。
9 與設(shè)備連接的布線要求。為了便于各種設(shè)備的維修,導(dǎo)線與各消防設(shè)備連接時(shí),連接導(dǎo)線應(yīng)留有不小于150mm的余量,且在其端部應(yīng)有明顯標(biāo)志。
10 自動(dòng)報(bào)警系統(tǒng)的布線要求。為了保證自動(dòng)報(bào)警系統(tǒng)的正常運(yùn)行,火災(zāi)自動(dòng)報(bào)警系統(tǒng)應(yīng)單獨(dú)布線,系統(tǒng)內(nèi)不同電壓等級(jí),不同電流類別的線路,不應(yīng)布置在同一管內(nèi)或線槽的同一槽孔內(nèi)。
三 消防設(shè)施檢測(cè)中常見的布線問題
布線作為消防設(shè)施系統(tǒng)的重要組成部分,其安裝質(zhì)量直接影響消防系統(tǒng)的正常運(yùn)行,如在火災(zāi)時(shí)因線路問題而使消防系統(tǒng)不能正常工作,將嚴(yán)重影響火災(zāi)報(bào)警、人員疏散、火災(zāi)撲救等,造成更大的生命財(cái)產(chǎn)損失。故在消防工程設(shè)計(jì)和施工時(shí),應(yīng)重視消防布線的布局、安裝、選材等環(huán)節(jié),盡量減少布線工程質(zhì)量問題。常見的布線質(zhì)量問題有以下幾點(diǎn):
1 線路穿管保護(hù)不到位。在現(xiàn)場(chǎng)檢測(cè)中,經(jīng)常發(fā)現(xiàn)從接線盒、線槽等處引到探測(cè)器底座、控制器、揚(yáng)聲器等設(shè)備的接線穿管保護(hù)不到位,接線盒處,以及設(shè)備連接處沒有穿管保護(hù)或是穿管保護(hù)沒有密封。穿管保護(hù)的目的在于防止布線受到火災(zāi)影響,如果布線沒有得到完整的保護(hù),那么火災(zāi)發(fā)生時(shí)消防系統(tǒng)的穩(wěn)定性將很難得到保證。
2 管線穿越變形縫時(shí)無固定保護(hù)和補(bǔ)償措施。實(shí)際施工中,很多施工人員為貪圖方便及偷工減料,在布線經(jīng)過建筑物變形縫時(shí)沒有留有足夠的余量和固定保護(hù),如變形縫在各種因素下出現(xiàn)變形或振動(dòng)時(shí),導(dǎo)線可能出現(xiàn)斷裂或脫落等現(xiàn)象。
3 吊裝線路的固定吊點(diǎn)或支點(diǎn)數(shù)量不足。同樣是由于施工問題引起的,吊點(diǎn)或支點(diǎn)不足會(huì)導(dǎo)致管路弧垂過大,管路安裝不牢固。
4 導(dǎo)線與消防設(shè)備連接處的余量不足且導(dǎo)線為標(biāo)識(shí)。很多工程為了節(jié)省導(dǎo)線成本,在設(shè)備和導(dǎo)線連接處沒有留有150mm長(zhǎng)的余量,且導(dǎo)線標(biāo)識(shí),導(dǎo)致設(shè)備在以后的維修中存在一定的困難。
5 敷設(shè)保護(hù)存在不足。曾在幾個(gè)消防工程設(shè)施檢測(cè)中發(fā)現(xiàn),導(dǎo)線經(jīng)阻燃硬質(zhì)塑料管保護(hù)后沒有采用暗敷。如不按照規(guī)范要求敷設(shè),導(dǎo)致火災(zāi)發(fā)生時(shí)消防控制、通訊和報(bào)警線路出現(xiàn)中斷,使滅火工作無法進(jìn)行,將造成更大的經(jīng)濟(jì)損失。
6 接地地線截面積不足。很多消防工程消防控制室的工作接地板引至各消防控制設(shè)備和火災(zāi)報(bào)警控制器的工作接地線應(yīng)采用截面積小于4mm2的銅芯導(dǎo)線。接地導(dǎo)線過小,可能導(dǎo)致接地電阻過大,或影響接地的穩(wěn)定性。
四 解決措施
1 對(duì)施工材料進(jìn)行嚴(yán)格把關(guān)。對(duì)導(dǎo)線、金屬管材、線槽等進(jìn)行100%的抽查檢驗(yàn),材料需經(jīng)有資質(zhì)的檢驗(yàn)單位按照產(chǎn)品國(guó)家標(biāo)準(zhǔn)或行業(yè)標(biāo)準(zhǔn)進(jìn)行檢驗(yàn)合格后方可使用。
2 系統(tǒng)施工前,需具備系統(tǒng)圖,接線圖以及必要的技術(shù)文件要求。
3 施工過程中需嚴(yán)格按照設(shè)計(jì)要求、接線圖、相關(guān)國(guó)家標(biāo)準(zhǔn)和規(guī)范進(jìn)行。施工過程中需做好施工(包括隱蔽工程驗(yàn)收)、檢驗(yàn)(絕緣電阻、接地電阻)、調(diào)試、設(shè)計(jì)變更等相關(guān)記錄。
4 系統(tǒng)施工完成后,須由施工方、工程監(jiān)理組織人員對(duì)施工質(zhì)量進(jìn)行檢查和記錄檢查內(nèi)容。
5 消防系統(tǒng)需定期由有資質(zhì)的管理單位人員進(jìn)行檢查維護(hù),防止由振動(dòng)、線路老化、人為破壞、老鼠咬壞線路等原因?qū)е孪到y(tǒng)布線出現(xiàn)質(zhì)量問題。
五 結(jié)語(yǔ)
消防工程布線看似簡(jiǎn)單,雖然國(guó)家標(biāo)準(zhǔn)和規(guī)范對(duì)布線要求較少,但消防布線卻非常重要,其安裝質(zhì)量直接影響消防設(shè)施系統(tǒng)的正常功能。本文通過列舉主要的布線要求,簡(jiǎn)單介紹消防布線的要求和說明。通過實(shí)際消防設(shè)施檢測(cè),指出當(dāng)前消防工程布線主要存在的問題,提出具體的解決措施。望各方消防技術(shù)人士共同把好消防系統(tǒng)布線的質(zhì)量關(guān),保證消防設(shè)施系統(tǒng)在火災(zāi)中能夠發(fā)揮應(yīng)有的作用。
參考文獻(xiàn)
[1]GB 50116-98 火災(zāi)自動(dòng)報(bào)警系統(tǒng)設(shè)計(jì)規(guī)范 [S].北京:中國(guó)計(jì)劃出版社,1999.
(下轉(zhuǎn)第135頁(yè))
(上接第103頁(yè))
[2]GB 50166-2007 火災(zāi)自動(dòng)報(bào)警系統(tǒng)施工及驗(yàn)收規(guī)范 [S].北京:中國(guó)計(jì)劃出版社,2007.
[3]GB 50303-2002 建筑電氣工程施工質(zhì)量驗(yàn)收規(guī)范 [S].北京:中國(guó)計(jì)劃出版社,2002.
[4]何濱.速學(xué)消防系統(tǒng)施工 [M].北京:中國(guó)電力出版社,2012.
消防工程合同書范文1 發(fā)包方: (簡(jiǎn)稱甲方)
承包方: (簡(jiǎn)稱乙方)
甲方委托乙方承擔(dān) 的消防系統(tǒng)施工,為確保工程順利完成,明確雙方責(zé)任,加強(qiáng)合作。經(jīng)雙方協(xié)商訂合同如下:
一、工程名稱地點(diǎn):
二、工程承包方式:包工包料;(包驗(yàn)收合格)
三、工程承包范圍:
室內(nèi)消火栓系統(tǒng)、室內(nèi)報(bào)警系統(tǒng)(不含滅火器及外圍消防外管,外圍報(bào)警聯(lián)動(dòng)工程量報(bào)價(jià))
四、工程包干總價(jià):
人民幣(大寫) (小寫)¥ 元;按工程進(jìn)度支付現(xiàn)金。
五、付款方式:
施工主材料進(jìn)場(chǎng),工人施工一周后,甲方首付乙方工程總款的15% ¥ 元整),乙方將廠區(qū)內(nèi)每單棟的水系統(tǒng)及報(bào)警系統(tǒng)工程量安裝施工完畢,甲方向乙方支付單棟工程總款的40%;工程驗(yàn)收合格,取得消防驗(yàn)收合格意見書后,甲方再付乙方工程總款的 95%;(¥ 元整),余款為工程總款的3% (¥ 元整),留作質(zhì)保金,質(zhì)保期為壹年,以取得消防驗(yàn)收合格意見書之日算起。待質(zhì)保期滿后,甲方一星期內(nèi)一次性付清全部余款。
六、雙方責(zé)任:
甲方責(zé)任
1.甲方要為工程順利進(jìn)行創(chuàng)造條件,并提供作業(yè)用水、用電、材料庫(kù)。
2.甲方應(yīng)及時(shí)提供消防報(bào)審、驗(yàn)收所需的資料,以保證工程及時(shí)審批及驗(yàn)收。如因甲方不能及時(shí)提供報(bào)審、驗(yàn)收所需資料造成的一切損失由甲方負(fù)責(zé)。
3.甲方提供藍(lán)圖(3套)組織乙方及有關(guān)部門進(jìn)行圖紙會(huì)審,向乙方進(jìn)行設(shè)計(jì)交底,整理圖紙會(huì)審和設(shè)計(jì)交底紀(jì)要。
4.協(xié)調(diào)處理各施工單位間關(guān)系,確保施工順利進(jìn)行。
5.甲方應(yīng)及時(shí)按合同付款,保證工程的順利進(jìn)行。
乙方責(zé)任
1.向甲方提供月度工程進(jìn)度計(jì)劃及相關(guān)統(tǒng)計(jì)報(bào)表和工程事故報(bào)告。嚴(yán)格按甲方安排的工程工期進(jìn)行施工,保證工程如期完工。
2.按工程需要提供和維修非夜間施工使用的照明、圍欄和警衛(wèi)等。如乙方未履行責(zé)任造成工程、財(cái)產(chǎn)和人身傷害,由乙方承擔(dān)責(zé)任。
3.遵守人民政府和有關(guān)管理規(guī)定,因乙方責(zé)任造成的費(fèi)用和罰款由乙方承擔(dān)。
4.保持施工現(xiàn)場(chǎng)整潔、符合文明施工等有關(guān)規(guī)定,工程交工前要達(dá)到工完場(chǎng)清的要求,承擔(dān)因違反有關(guān)規(guī)定造成的損失和罰款(非乙方責(zé)任造成的損失和罰款,由責(zé)任方承擔(dān))。
5.負(fù)責(zé)已完工程的成品保護(hù),承擔(dān)在交付甲方之前發(fā)生損失部分的修復(fù)費(fèi)用。接受甲方對(duì)已完部分工程采取特殊保護(hù)措施的要求。采取特殊保護(hù)措施和甲方提前使用未交付工程發(fā)生損壞的經(jīng)濟(jì)支出,由甲方承擔(dān)。
6.參加甲方組織的圖紙會(huì)審和設(shè)計(jì)交底。
7.乙方應(yīng)自備施工現(xiàn)場(chǎng)的電表,電費(fèi)由乙方自理。
8.乙方就按時(shí)參加甲方組織的協(xié)調(diào)會(huì),處理好與其他施工單位的關(guān)系。乙方施工過程中對(duì)土建工程的破壞修補(bǔ)等必須服從甲方的安排、監(jiān)督和管理。
9.乙方應(yīng)在投入使用前,負(fù)責(zé)協(xié)助甲方辦理本建筑消防報(bào)建及驗(yàn)收手續(xù),相關(guān)費(fèi)用由甲方負(fù)責(zé)。
10.乙方負(fù)責(zé)跟蹤服務(wù),保修甲方負(fù)責(zé)材料費(fèi),乙方負(fù)責(zé)安裝維修。
八、本合同一式二份,甲乙雙方各執(zhí)壹份,具有同等法律效力。以上合同共同遵守。未盡事宜,雙方本著真誠(chéng)合作的精神協(xié)商解決 。
甲方(公章):_________ 乙方(公章):_________
法定代表人(簽字):_________ 法定代表人(簽字):_________
_________年____月____日 _________年____月____日
消防工程合同書范文2 發(fā)包人: (以下簡(jiǎn)稱甲方)
承包人: (以下簡(jiǎn)稱乙方)
依照《中華人民共和國(guó)合同法》、《中華人民共和國(guó)建筑法》及相關(guān)法律、行政法規(guī)規(guī)定,甲乙雙方遵循平等、自愿、公平和誠(chéng)實(shí)信用原則、協(xié)商一致,甲方?jīng)Q定將池州市貴池區(qū)寶賽小學(xué)建設(shè)工程C區(qū)消防工程交由乙方承包施工,為明確雙方權(quán)利和義務(wù),特訂立本合同,雙方共同遵守。
一、工程概況
1、工程名稱:池州市貴池區(qū)寶賽小學(xué)建設(shè)工程C區(qū)
2、工程地點(diǎn):池州市貴池區(qū)前江工業(yè)園
二、承包范圍
(1)室內(nèi)、外消火栓系統(tǒng);應(yīng)急照明疏散系統(tǒng);防火門。
(2)承包方式:包工、包料、包安全、包驗(yàn)收合格。
三、合同工期
合同工期:按甲方施工進(jìn)度計(jì)劃表要求完工,配合土建工程進(jìn)度。
四、質(zhì)量標(biāo)準(zhǔn)
工程質(zhì)量標(biāo)準(zhǔn):完成設(shè)計(jì)圖紙的范圍內(nèi)的消防工程,符合消防工程相關(guān)驗(yàn)收規(guī)范,經(jīng)五方主體共同檢驗(yàn),消防驗(yàn)收合格意見書。
五、合同價(jià)款
1、本合同價(jià)包含乙方施工消防材料,材料檢驗(yàn)費(fèi)、第三方消防檢測(cè)費(fèi)。
2、工程總造價(jià):按消防工程的決算總價(jià)的79%支付乙方。
六、付款方式
單位工程經(jīng)業(yè)主、監(jiān)理、設(shè)計(jì)院、區(qū)建委組織驗(yàn)收合格備案后,按甲方和業(yè)主簽訂的大合同同比例付款。
七、雙方負(fù)責(zé)事項(xiàng)
1、甲方責(zé)任和義務(wù):
(1)指派
(2)提供工程相關(guān)施工變更資料;施工中途如遇變更及增減項(xiàng)目,應(yīng)提前向乙方發(fā)出變更通知單;
(3)提供施工用水、用電及存放工具用房及材料倉(cāng)庫(kù);
(4)如在施工中出現(xiàn)需要協(xié)調(diào)的問題,甲方應(yīng)及時(shí)組織施工方等相關(guān)單位協(xié)調(diào)解決。
2、乙方責(zé)任和義務(wù):
(1)指派 負(fù)責(zé)施工現(xiàn)場(chǎng)的各方協(xié)調(diào)工作;
(2)乙方應(yīng)按相關(guān)消防規(guī)范進(jìn)行施工,及時(shí)與甲方溝通配合,解決消防系統(tǒng)中存在的問題,保證施工進(jìn)度和質(zhì)量,并保證項(xiàng)目通過消防主管部門驗(yàn)收;
(3)乙方施工應(yīng)嚴(yán)格遵守現(xiàn)場(chǎng)文明施工規(guī)定,嚴(yán)格按照安全施工操作規(guī)程施工,發(fā)生安全事故責(zé)任自負(fù),進(jìn)場(chǎng)前應(yīng)該給施工人員購(gòu)買工傷保險(xiǎn);
(4)乙方應(yīng)嚴(yán)格履行合同,如存在偷工減料行為,一切損失由乙方承擔(dān);
(5)在工程竣工驗(yàn)收合格前,成品與半成品保護(hù)均由乙方負(fù)責(zé);
(6)本工程竣工驗(yàn)收之日起,非業(yè)主使用不當(dāng),根據(jù)《建設(shè)工程質(zhì)量管理?xiàng)l例》最低保修期限為貳年。
八、其他約定事宜
1、乙方在工程施工過程中服從甲方的統(tǒng)一管理及進(jìn)度安排,工程竣工前需經(jīng)甲方驗(yàn)收合格后方可報(bào)檢測(cè)驗(yàn)收。乙方在工程竣工前,提供竣工驗(yàn)收申請(qǐng)報(bào)告,并附全套竣工資料。
2、若乙方在施工過程中存在質(zhì)量、工期不符合本合同要求的情況,或因自身資質(zhì)不過關(guān),甲方有權(quán)終止本合同的執(zhí)行,更換施工隊(duì)伍,由此造成的一切損失由乙方承擔(dān)。
3、未經(jīng)甲方許可乙方不得將工程分包給其他施工單位施工,一經(jīng)發(fā)現(xiàn)甲方有權(quán)終止合同一切損失并讓乙方清退出場(chǎng);
4、乙方自購(gòu)材料須經(jīng)甲方驗(yàn)收后方可使用,并將材料的產(chǎn)品合格證、試驗(yàn)報(bào)告等參數(shù)及相關(guān)資料報(bào)甲方;
5、乙方施工時(shí)擅自更換材料或不按照施工規(guī)范施工,而不能保證工程質(zhì)量,甲方可立即終止合同,并由乙方承擔(dān)一切費(fèi)用等損失;
6、變更部分工程量增減以施工現(xiàn)場(chǎng)經(jīng)濟(jì)技術(shù)聯(lián)系單方式辦理,在結(jié)算時(shí)調(diào)整;
九、合同生效
1、本合同時(shí)間:年月
2、本合同在執(zhí)行過程中,如遇爭(zhēng)議,協(xié)商不成,可向人民法院起訴;
3、本合同雙方簽字蓋章生效,工程竣工、保修期滿、工程款結(jié)算完畢后終止;
4、本合同未盡事宜,可列附言作為合同的補(bǔ)充條款;
5、本合同一式二份,甲乙雙方執(zhí)一份。
甲方(公章):_________ 乙方(公章):_________
法定代表人(簽字):_________ 法定代表人(簽字):_________
_________年____月____日 _________年____月____日
消防工程合同書范文3 甲方:
乙方:
依照《中華人民共和國(guó)合同法》、《中華人民共和國(guó)建筑法》,及其他有關(guān)法律、法規(guī),遵循平等、自愿、公平和誠(chéng)信的原則。雙方就啟城項(xiàng)目消防系統(tǒng)安裝工程事項(xiàng)協(xié)商一致訂立本合同:
一、工程名稱:石家莊市紡器一廠宿舍危房改造啟城住宅小區(qū)。
二、建設(shè)地點(diǎn):中華大街以西,民安胡同以南,原市紡織器材一廠宿舍舊址。
三、工程內(nèi)容:本標(biāo)段工程圖紙內(nèi)所設(shè)計(jì)的消火栓系統(tǒng)、自動(dòng)噴水滅火系統(tǒng)、火災(zāi)自動(dòng)報(bào)警及聯(lián)動(dòng)系統(tǒng)、與消防系統(tǒng)相連的通風(fēng)排煙設(shè)施等所有消防系統(tǒng)成品半成品的購(gòu)買及安裝,以及消防安裝系統(tǒng)的資料采集、系統(tǒng)報(bào)驗(yàn)、試驗(yàn)和竣工驗(yàn)收并合格。
四、承包方式
1、包工包料及圖紙?jiān)O(shè)計(jì)所含的所有消防內(nèi)容,包括竣工驗(yàn)收。本項(xiàng)目不得肢解分包。
2、乙方負(fù)責(zé)本合同工程資料的整理、報(bào)驗(yàn),并密切配合土建總承包單位服從總承包單位的管理。
3、乙方負(fù)責(zé)本合同段與消防監(jiān)督部門和相關(guān)部門的協(xié)調(diào)工作,并使本工程按甲方規(guī)定工期要求通過相關(guān)部門的驗(yàn)收并交付使用。
五、合同價(jià)款:本標(biāo)段公寓樓為第四標(biāo)段,合同暫定總價(jià)為含稅價(jià)170萬元(大寫:壹佰柒拾萬元整)。本價(jià)格不作為最終價(jià)格,只作為中間撥付工程款的依據(jù),最終價(jià)格為工程竣工驗(yàn)收后,甲、乙雙方按《河北省建筑安裝定額》(2008年版)、《河北省建安工程取費(fèi)標(biāo)準(zhǔn)》三類取費(fèi),總價(jià)下浮2%進(jìn)行計(jì)算。材料價(jià)格取定依據(jù)市場(chǎng)或石家莊市造價(jià)信息指導(dǎo)價(jià)為依據(jù)進(jìn)行計(jì)算。開工前乙方為甲方提供本標(biāo)段《工程預(yù)算單》。
六、付款方式:本工程無預(yù)付款。工程全部完成后經(jīng)甲、乙、監(jiān)理三方驗(yàn)收,七日內(nèi)甲方憑乙方開據(jù)的有效發(fā)票付至合同總價(jià)的60%;消防主管部門驗(yàn)收合格并取得書面證明后十五日內(nèi)甲方憑乙方開據(jù)的有效發(fā)票付至合同總價(jià)的85%;最終驗(yàn)收含本標(biāo)段與工程同步的相關(guān)資料,并交付承包單位接收歸檔,審計(jì)完后甲方憑乙方審定價(jià)的差額發(fā)票付至總價(jià)的95%,剩余5%為質(zhì)保金。本工程質(zhì)保期為二年。質(zhì)保期滿一年后無質(zhì)量問題付合同總價(jià)的2.5%,質(zhì)保期滿二年后無質(zhì)量問題十日內(nèi)余款一次性結(jié)清。
七、合同工期:2012年 月 日至2012年 月 日。
八、工程質(zhì)量及驗(yàn)收標(biāo)準(zhǔn)
1、本工程質(zhì)量標(biāo)準(zhǔn):合格
2、本工程由甲、乙、監(jiān)理三方及消防主管部門依據(jù)施工圖紙,設(shè)計(jì)說明,設(shè)計(jì)變更和國(guó)家相關(guān)標(biāo)準(zhǔn)、規(guī)范為依據(jù)進(jìn)行驗(yàn)收。
3、本工程的主要材料及設(shè)備,甲方指定二至三個(gè)廠家(電氣火災(zāi)監(jiān)控系統(tǒng)產(chǎn)品為一個(gè)廠家),并認(rèn)質(zhì)認(rèn)價(jià),但材料、設(shè)備由乙方自行采購(gòu)。乙方所進(jìn)場(chǎng)的各種原材料、設(shè)備必須有出廠合格證、材質(zhì)單及相關(guān)證明。相關(guān)材料的化驗(yàn)、試驗(yàn)必須按相關(guān)規(guī)范規(guī)定的程序進(jìn)行,化驗(yàn)、試驗(yàn)所需費(fèi)用由乙方承擔(dān)。不合格的材料、設(shè)備不允許進(jìn)場(chǎng)使用和安裝。甲方對(duì)原材料有權(quán)隨機(jī)抽樣進(jìn)行檢驗(yàn),但化驗(yàn)、試驗(yàn)費(fèi)用由乙方承擔(dān)。
4、工程質(zhì)量驗(yàn)收依據(jù):《建設(shè)工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)》GB50300-2001,《高層民用建筑防火設(shè)計(jì)規(guī)范》,《自動(dòng)噴水滅火系統(tǒng)施工及驗(yàn)收規(guī)范》GB50261-2005,《機(jī)械設(shè)備安裝工程施工及驗(yàn)收規(guī)范》,《建筑工程電器安裝工程施工驗(yàn)收規(guī)范》GB50303-2002,《室內(nèi)消火栓給水滅火系統(tǒng)安裝工程施工工藝標(biāo)準(zhǔn)》以及相關(guān)的法律、法規(guī)、標(biāo)準(zhǔn)、規(guī)范。
5、乙方在交付使用前必須進(jìn)行48 小時(shí)的試運(yùn)行實(shí)驗(yàn)并調(diào)試。
九、現(xiàn)場(chǎng)安全文明施工:乙方必須遵守現(xiàn)場(chǎng)承包單位的統(tǒng)一安排,認(rèn)真執(zhí)行安全生產(chǎn)操作規(guī)程,認(rèn)真執(zhí)行文明施工的相關(guān)規(guī)定。在施工過程中違反有關(guān)安全操作規(guī)程或消防的相關(guān)條令,導(dǎo)致發(fā)生質(zhì)量、安全事故或火災(zāi)事故,全部事故責(zé)任均由乙方承擔(dān),甲方不承擔(dān)任何連帶責(zé)任,由此造成的一切損失由乙方全部承擔(dān)。
十、質(zhì)量維保
1、乙方接到甲方維修通知后,一個(gè)工作日內(nèi)必須維修完畢,并達(dá)到使用功能。
2、在維保期內(nèi),乙方必須有專人對(duì)本項(xiàng)目負(fù)責(zé),定期與甲方溝通,同時(shí)保證通訊暢通,令雙方能及時(shí)取得聯(lián)系。因通信不暢或推諉,甲方將視為放棄維保責(zé)任。甲方有權(quán)自行解決維修,并按所需相關(guān)費(fèi)用雙倍自質(zhì)保金中扣除,質(zhì)保金不足部分乙方負(fù)責(zé)自行補(bǔ)足。
3、乙方進(jìn)場(chǎng)維保時(shí)所用原材料及設(shè)備必須與原采用材料、設(shè)備相符。對(duì)同一個(gè)質(zhì)量事故不能重復(fù)發(fā)生,如同一問題維修二次以上(含2次),甲方視乙方為責(zé)任心不強(qiáng)、技術(shù)不過關(guān)而自行解決,費(fèi)用按上述第2項(xiàng)的辦法進(jìn)行扣除。
十一、雙方的權(quán)利和義務(wù)
1、甲方負(fù)責(zé)為乙方協(xié)調(diào)施工用水、電源,費(fèi)用由乙方自理。
2、乙方在合同簽訂后向甲方、監(jiān)理方提供相關(guān)的有效資質(zhì)證件。
3、乙方必須向甲方、監(jiān)理方提供施工組織設(shè)計(jì)、質(zhì)保體系及相關(guān)資料。
4、乙方必須按照設(shè)計(jì)要求、相關(guān)標(biāo)準(zhǔn)及規(guī)范要求進(jìn)行施工,不得擅自變更圖紙,如擅自改動(dòng)所造成的損失由乙方承擔(dān)全部責(zé)任。
5、乙方提出的工程洽商記錄必須經(jīng)甲方、監(jiān)理方、設(shè)計(jì)方簽字確認(rèn)后方可組織施工,否則后果自負(fù),如給甲方造成經(jīng)濟(jì)損失的由乙方予以賠償。
6、乙方對(duì)消防電氣線路、消防給水管隱蔽工程必須進(jìn)行隱蔽驗(yàn)收,并做好隱蔽驗(yàn)收記錄,以及相關(guān)測(cè)試記錄。消防系統(tǒng)未經(jīng)消防主管部門驗(yàn)收前,乙方應(yīng)對(duì)整個(gè)消防系統(tǒng)負(fù)責(zé)。消防系統(tǒng)驗(yàn)收合格后,乙方必須履行自己的職責(zé)向甲方提供與工程相關(guān)的全部備檔資料及使用說明書。
7、工程竣工驗(yàn)收合格后未正式移交甲方前,乙方應(yīng)妥善保護(hù)好本標(biāo)段的所有系統(tǒng)及設(shè)備工程,如造成損壞乙方負(fù)責(zé)賠償。
8、乙方為甲方無條件培訓(xùn)維修人員,直至能獨(dú)立操作為止。
十二、違約責(zé)任及賠償
1、乙方未按合同工期交付,每延誤一天,乙方向甲方賠付工程總造價(jià)2的違約金。
2、工程未達(dá)到合格要求,經(jīng)消防主管部門驗(yàn)收未達(dá)到驗(yàn)收標(biāo)準(zhǔn),乙方承擔(dān)給甲方造成的一切損失,同時(shí)在甲方指定的時(shí)間內(nèi)無償返工至合格并通過消防驗(yàn)收。
3、乙方必須在竣工驗(yàn)收合格后7日內(nèi)將工程相關(guān)資料交付甲方,否則每延誤一天,須向甲方交付工程造價(jià)2的違約金。
十三、爭(zhēng)議解決
本合同發(fā)生爭(zhēng)議,雙方協(xié)商解決,協(xié)商不成雙方都又向當(dāng)?shù)厝嗣穹ㄔ浩鹪V的權(quán)力。
十四、其他約定
1、本合同書一式四份,甲乙雙方各兩份。
2、本合同自雙方簽字蓋章之日起生效。
3、本合同未盡事宜,雙方可簽訂補(bǔ)充協(xié)議及相關(guān)說明,均為本合同的組成部分,與本合同具有同等的法律效力。
4、本合同簽訂之后,任何一方不得以任何理由違約,如有一方違約,違約方承擔(dān)由此造成的全部損失及責(zé)任。
甲方(公章):_________ 乙方(公章):_________
1.1自動(dòng)噴淋系統(tǒng)和消火栓給水系統(tǒng)的問題
自動(dòng)噴淋系統(tǒng)和消火栓給水系統(tǒng)的問題是施工質(zhì)量出現(xiàn)問題的主要方面,主要表現(xiàn)為:(1)消防給水管道采用鍍鋅管,施工單位違章進(jìn)行焊接,造成鍍層破壞,防腐性能降低,管道容易銹蝕、漏水;不按設(shè)計(jì)要求施工。(2)噴淋系統(tǒng)采用的管徑和安裝的噴頭數(shù)量是根據(jù)防火設(shè)計(jì)規(guī)范規(guī)定計(jì)算而設(shè)計(jì)的,有的施工單位為了降低成本隨意減小供水管徑,從而造成供水量不足,灑水噴頭的灑水密度達(dá)不到要求;在消防水泵房?jī)?nèi),系統(tǒng)供水管上,未設(shè)試驗(yàn)和檢查用的壓力表和放水閥門,同時(shí)也無安全閥,難以進(jìn)行正常的系統(tǒng)維護(hù)保養(yǎng)。(3)系統(tǒng)供水管網(wǎng)上沒有出水閥門和安全閥,水泵啟動(dòng)時(shí),極易造成消防管網(wǎng)內(nèi)壓力瞬間升高,引起水管爆裂,從而無法進(jìn)行消防供水;最后,消防與生活合用水池或水箱,無保證消防用水不被它用的措施,消防用水無法得到保證。如消防與生活合用水池經(jīng)常發(fā)現(xiàn)消防與生活出水管位于同一平面,而位于水池生活管道出水口上也未開有防止吸用消防用水的小氣孔;有的消防與生活用高位水箱出水口在同一平面,或兩者出水管上下間隔太小,消防用水無法保證。
1.2消防配電系統(tǒng)存在的問題
消防配電系統(tǒng)存在的問題主要體現(xiàn)在以下方面:(1)主、備電源不能自動(dòng)切換,電源切換采用手動(dòng)切換方式。當(dāng)一路失電后,另一路不能自投供電,延誤系統(tǒng)啟動(dòng)時(shí)間。(2)有的建筑是按一級(jí)負(fù)荷設(shè)計(jì),兩路供電,且要求兩路電源相互獨(dú)立,但兩路電源往往不獨(dú)立,實(shí)際上是一路供電;有的備用電源,采用自備發(fā)電機(jī),但發(fā)電機(jī)容量偏小,不能滿足負(fù)荷要求。(3)配線安裝不符合要求,有的消防配電線路使用敞開式橋架鋪設(shè),有的違反規(guī)定使用塑料槽保護(hù),有的使用未進(jìn)行防火處理的明金屬管。
1.3火災(zāi)探測(cè)器的安裝問題
火災(zāi)探測(cè)器的安裝問題表現(xiàn)為:(1)實(shí)際安裝的探測(cè)器種類、型號(hào)和設(shè)計(jì)不一致,且變動(dòng)后的探測(cè)器保護(hù)面積和保護(hù)半徑未重新布置;(2)探測(cè)器的布置位置、數(shù)量、安裝高度未根據(jù)裝修情況做適當(dāng)調(diào)整;(3)探測(cè)器靈敏度調(diào)節(jié)不適當(dāng);(4)探測(cè)器安裝固定不牢固,無預(yù)埋盒(接線盒);(5)探測(cè)器的確認(rèn)燈方向不恰當(dāng)。
1.4系統(tǒng)布線的問題
系統(tǒng)布線的問題是施工系統(tǒng)中最煩瑣的部分,容易出現(xiàn)一些問題:預(yù)埋線管不通,管口位置不準(zhǔn)確,未預(yù)埋接線盒;明敷穿線管未固定,或固定不規(guī)范;明敷報(bào)警信號(hào)線穿管不到位;管接頭、管盒接口脫節(jié);導(dǎo)線連接采用扭接,或壓接、焊接不規(guī)范;消防控制和警報(bào)線路明敷未穿金屬管或穿金屬不涂防火涂料保護(hù);穿線前未對(duì)管內(nèi)進(jìn)行吹掃,鋼管(電線管)穿線無護(hù)口,損傷絕緣層;穿管電線總截面積大于管內(nèi)孔截面積的40%,穿線困難;金屬管子、支吊架未進(jìn)行除銹刷漆,鍍鋅鋼管焊接處未及時(shí)刷防腐油或有遺漏。
2.消防系統(tǒng)施工質(zhì)量控制的對(duì)策
2.1強(qiáng)化施工企業(yè)的內(nèi)部管理
消防工程專業(yè)施工企業(yè)必須從一開始就建立消防工程檔案。健全各種檢驗(yàn)制度。對(duì)隱蔽工程要進(jìn)行過程檢驗(yàn)和最終檢驗(yàn);并提供有關(guān)消防設(shè)施安裝調(diào)試記錄,開通報(bào)告,隱蔽工程記錄及使用手冊(cè)等資料,履行交接手續(xù)做好后期維護(hù)保養(yǎng)工作。消防工程專業(yè)施工企業(yè)在施工前;協(xié)助建設(shè)單位,設(shè)計(jì)單位完善原設(shè)計(jì)圖紙,特別是防排煙正壓送風(fēng),事故電源切換,應(yīng)急廣播,電梯迫降,防火分區(qū)的劃分等設(shè)計(jì)是否滿足消防規(guī)范要求。建立健全消防工程施工企業(yè)的質(zhì)量管理體系,完善并落實(shí)企業(yè)技術(shù)負(fù)責(zé)人,項(xiàng)目負(fù)責(zé)人,施工調(diào)試人員三級(jí)質(zhì)量管理崗位責(zé)任制度;完善企業(yè)內(nèi)部消防設(shè)施施工操作技術(shù)規(guī)程和調(diào)試檢測(cè)規(guī)程;落實(shí)作業(yè)現(xiàn)場(chǎng)質(zhì)量記錄和工程完工檢驗(yàn)試驗(yàn)制度;落實(shí)采購(gòu)驗(yàn)收,施工和調(diào)試器具校驗(yàn)#強(qiáng)化質(zhì)量審核制度,以《消防法》為指針,為提高消防工程質(zhì)量發(fā)揮作用.
2.2充分發(fā)揮工程監(jiān)理的作用
監(jiān)督單位在接受業(yè)主委托的范圍內(nèi)開展監(jiān)理活動(dòng),在保障工程質(zhì)量方面發(fā)揮著重要的作用。但在對(duì)某地的施工調(diào)查中發(fā)現(xiàn),工程監(jiān)理單位對(duì)消防設(shè)施的施工監(jiān)管力度十分有限。如有的建筑消防設(shè)施施工沒有列入監(jiān)理的監(jiān)管范圍,有的建筑的設(shè)施施工雖然納入了整體工程監(jiān)理監(jiān)管范圍,但因各種原因,監(jiān)理人員發(fā)現(xiàn)施工不符合建筑質(zhì)量標(biāo)準(zhǔn)、不符合有關(guān)的消防技術(shù)規(guī)范要求,向建設(shè)單位報(bào)告,建設(shè)單位不但不理采,有的甚至對(duì)監(jiān)理人員倒打一把,致使監(jiān)理人員想管卻管不了,最終放任自流。這種現(xiàn)象直接影響了消防工程的施工質(zhì)量,火災(zāi)自動(dòng)報(bào)警系統(tǒng)的施工首當(dāng)其沖。要切實(shí)加強(qiáng)建筑工程的施工監(jiān)督管理,保障消防設(shè)施的施工質(zhì)量,必須要充分發(fā)揮監(jiān)理對(duì)建設(shè)工程的控制、協(xié)調(diào)、管理的作用。
監(jiān)理要認(rèn)真讀圖,針對(duì)消防部門的批復(fù)意見督促設(shè)計(jì)師進(jìn)行優(yōu)化設(shè)計(jì)以獲得再次批準(zhǔn)。嚴(yán)格審查施工申報(bào)的施工組織設(shè)計(jì),督促其完善自身的質(zhì)量保證體系。施工組織設(shè)計(jì)內(nèi)容必須完善、科學(xué)、合理且合法,符合規(guī)范及圖紙要求;進(jìn)度應(yīng)滿足合同的要求,并有與其它專業(yè)交*配合的具體措施。施工方必須人、責(zé)、崗到位,各工序須自檢合格報(bào)驗(yàn)后由監(jiān)理方復(fù)驗(yàn),驗(yàn)收合格后方可進(jìn)行下道工序。在施工階段,監(jiān)理要嚴(yán)把材料設(shè)備質(zhì)量關(guān),重兩頭,保中間,通過對(duì)質(zhì)量控制點(diǎn)把關(guān)來實(shí)現(xiàn)對(duì)系統(tǒng)的全面控制?!爸貎深^”指事前和事后控制,即分項(xiàng)工程施工前須先有技術(shù)方案、技術(shù)交底及相應(yīng)的質(zhì)保措施方可施工,消防系統(tǒng)所用元件、組件、材料及設(shè)備必須經(jīng)國(guó)家消防產(chǎn)品質(zhì)量監(jiān)督檢測(cè)中心檢測(cè)合格。“保中間”指通過對(duì)各質(zhì)量控制點(diǎn)的控制,及時(shí)發(fā)現(xiàn)并糾正存在的質(zhì)量問題。
2.3認(rèn)真編制施工組織設(shè)計(jì)
施工企業(yè)中標(biāo)后,對(duì)投標(biāo)時(shí)的施工組織設(shè)計(jì)要根據(jù)現(xiàn)場(chǎng)情況和業(yè)主的要求進(jìn)行補(bǔ)充完整。特別是對(duì)項(xiàng)目經(jīng)理的委派、管理班子的選配、施工組織、勞動(dòng)力的安排、質(zhì)量保證體系、安全保證體系、工程質(zhì)量的檢驗(yàn)以及隱蔽工程的聯(lián)檢制度、主要工程的施工方案、工程總進(jìn)度的安排、施工機(jī)具的狀況及到位、不同專業(yè)、工種交*作業(yè)的配合措施、現(xiàn)場(chǎng)的總平面布置、設(shè)備和材料進(jìn)場(chǎng)時(shí)間、采取的文明施工措施等內(nèi)容都要符合工程和現(xiàn)場(chǎng)的實(shí)際情況,以便在施工過程中能夠抓住重點(diǎn)、適時(shí)監(jiān)控、確保工程優(yōu)質(zhì)按期完成。
在工程施工階段,施工企業(yè)主要是抓進(jìn)度、安全、質(zhì)量,在保證安全施工的情況下,應(yīng)該是“百年大計(jì)、質(zhì)量第一”,并以優(yōu)良質(zhì)量來保證工程的進(jìn)度??傮w上講要嚴(yán)格按照消防工程施工及驗(yàn)收規(guī)范施工,一是對(duì)設(shè)備、材料要把關(guān),到達(dá)現(xiàn)場(chǎng)的設(shè)備材料不僅要有合格證、檢驗(yàn)報(bào)告,而且還應(yīng)附帶說明書、操作手冊(cè)等軟件資料。二是各工序的施工要嚴(yán)格把關(guān),要做到自檢、互檢、共檢,尤其是隱蔽工程和工序間銜接要有具體的質(zhì)量保證手段。三是施工中要做好設(shè)計(jì)修改、原始記錄、檢驗(yàn)記錄、調(diào)試數(shù)據(jù)等軟件資料工作,并保證這些資料的真實(shí)性和準(zhǔn)確性。
2.4完善施工企業(yè)質(zhì)量管理監(jiān)督體系
隨著消防專業(yè)施工隊(duì)伍增多,競(jìng)爭(zhēng)越來越激烈,出現(xiàn)競(jìng)相壓價(jià)。質(zhì)量保證問題應(yīng)作為重要因素提出。消防專業(yè)施工應(yīng)遵循質(zhì)量效益一致的原則,即優(yōu)質(zhì)優(yōu)價(jià),建立健全消防工程專業(yè)施工企業(yè)質(zhì)量管理監(jiān)督體系,是現(xiàn)階段行之有效的途徑。從目前看,部分施工企業(yè)只滿足消防功能,卻忽視安裝質(zhì)量,導(dǎo)致驗(yàn)收過了,系統(tǒng)運(yùn)行不可*。
從源頭上加強(qiáng)建筑工程施工監(jiān)督對(duì)重大建筑工程的施工監(jiān)督應(yīng)引起高度重視,克服重審核驗(yàn)收、輕監(jiān)督管理的安逸思想。施工監(jiān)督是促使建設(shè)單位遵守消防法律、法規(guī)的重要手段,也是促使建設(shè)單位按核準(zhǔn)圖紙施工的有效方法之一,為建筑消防設(shè)施施工質(zhì)量提供有力的保障,特別是針對(duì)一些建設(shè)規(guī)模宏大的建筑工程來說,加強(qiáng)建筑工程施工監(jiān)督尤為重要。如果施工監(jiān)督工作被忽視或滯后于建設(shè)進(jìn)度,不但會(huì)造成不必要的浪費(fèi),而且會(huì)給建筑留下先天性火災(zāi)隱患,也不能及時(shí)糾正審核中出現(xiàn)的失誤。
通常,在施工監(jiān)督中,有的高層建筑室內(nèi)消火栓系統(tǒng)的安裝,根本不按核準(zhǔn)的設(shè)計(jì)說明要求施工,違規(guī)操作。經(jīng)責(zé)令改正后,建設(shè)單位和施工單位都一定程度的損失。有的高層建筑自動(dòng)消防設(shè)施在安裝過程出現(xiàn)的各種問題,因監(jiān)督力度薄弱,沒有及時(shí)得到協(xié)調(diào)解決,致使按圖施工也會(huì)出現(xiàn)隱患的現(xiàn)象。因此要抓好施工監(jiān)督員的業(yè)務(wù)素質(zhì),從人力、物力、時(shí)間等方面保證施工監(jiān)督的相對(duì)穩(wěn)定。對(duì)重大工程要有施工監(jiān)督的方案,充分發(fā)揮監(jiān)督的主動(dòng)性,杜絕偷工減料、弄虛作假、違章施工的現(xiàn)象,切實(shí)加強(qiáng)對(duì)建筑工程的施工監(jiān)督管理。
參考文獻(xiàn):
1.GB50084-2001,自動(dòng)噴水滅火系統(tǒng)設(shè)計(jì)規(guī)范.
2.GB50116-1998,火災(zāi)自動(dòng)報(bào)警系統(tǒng)設(shè)計(jì)規(guī)范.
3.GB50166-92,火災(zāi)自動(dòng)報(bào)警系統(tǒng)施工及驗(yàn)收規(guī)范.
4.GB50263-97,氣體滅火系統(tǒng)施工及驗(yàn)收規(guī)范.
5.建筑消防設(shè)施工程技術(shù),中華人民共和國(guó)公安部消防局
【關(guān)鍵詞】:消防工程;消防施工
中圖分類號(hào):TU998.1文獻(xiàn)標(biāo)識(shí)碼: A 文章編號(hào):
消防企業(yè)在建筑安裝施工中確實(shí)體現(xiàn)了專業(yè)設(shè)計(jì)、專業(yè)施工、專業(yè)維護(hù)的明顯優(yōu)勢(shì),為提高建筑工程的質(zhì)量、保障消防安全作出了很大努力,很大貢獻(xiàn)。但伴隨著消防工程專業(yè)施工隊(duì)伍的不斷擴(kuò)大和用戶對(duì)消防工程設(shè)計(jì)、施工、維護(hù)等方面的質(zhì)量要求越來越高,消防工程專業(yè)施工企業(yè)在內(nèi)部管理上、質(zhì)量責(zé)任上、依法從事消防施工等方面也遇到了一些新的問題和困難,下面就這些問題作簡(jiǎn)要的說明和探討。
一、關(guān)于質(zhì)量責(zé)任方面的問題
消防工程是構(gòu)成建筑工程的基本單元,因其專業(yè)要求嚴(yán)格和技術(shù)含量大而直接關(guān)系到整個(gè)建筑物體的消防安全,關(guān)系到防火滅火的成敗。因此質(zhì)量責(zé)任非同尋常、至關(guān)重要,必須給予極大的關(guān)注?!督ㄖā?、《消防法》和公安部(96)30號(hào)令《建筑工程消防監(jiān)督審核管理規(guī)定》等法規(guī)文件都明確規(guī)定了要對(duì)消防工程實(shí)行消防監(jiān)督、專業(yè)許可。
1.1建設(shè)單位應(yīng)當(dāng)將建筑工程的消防設(shè)計(jì)、施工發(fā)包給具有相應(yīng)資質(zhì)等級(jí)的消防工程專業(yè)設(shè)計(jì)、施工企業(yè)。在依法委托建筑工程監(jiān)理時(shí),須將建筑的消防工程質(zhì)量一并委托給監(jiān)理單位。須按消防設(shè)計(jì)要求采購(gòu)設(shè)備,不應(yīng)指使施工企業(yè)使用不合格的消防產(chǎn)品。應(yīng)當(dāng)按照國(guó)家工程建設(shè)防火技術(shù)規(guī)范等要求報(bào)送消防設(shè)計(jì)施工圖紙等文件資料,重要的工程項(xiàng)目還要專送消防設(shè)計(jì)專篇。工程竣工后,建設(shè)單位必須建立消防工程質(zhì)量檔案。
1.2設(shè)計(jì)單位要嚴(yán)格執(zhí)行國(guó)家消防法律法規(guī)和工程的防火技術(shù)規(guī)范,特別是有關(guān)工程的防火安全強(qiáng)制性條款。要改變現(xiàn)有的建審模式,即從繁復(fù)大量的具體圖紙檢查作業(yè)中解放出來,重點(diǎn)放在消防監(jiān)督審核上。我們的建審部門不應(yīng)當(dāng)是設(shè)計(jì)單位的"審核部",而應(yīng)當(dāng)是代表政府的消防監(jiān)督機(jī)關(guān),可以實(shí)行抽查制,對(duì)不符合法律法規(guī)要求的依法懲處。
1.3施工企業(yè)首先要忠實(shí)于設(shè)計(jì)文件不得隨意改變,并且要嚴(yán)格按照消防設(shè)計(jì)規(guī)范進(jìn)行專業(yè)施工,這是最起碼的要求。其次,要嚴(yán)格遵守防火設(shè)計(jì)、施工和驗(yàn)收規(guī)范以及行業(yè)標(biāo)準(zhǔn),發(fā)現(xiàn)違規(guī)和缺陷要主動(dòng)及時(shí)報(bào)告,不能明知有問題帶"病"施工。要協(xié)助建設(shè)單位、設(shè)計(jì)單位完善主體設(shè)計(jì)、特別是消防工程的專業(yè)內(nèi)容,要對(duì)工程中使用的消防產(chǎn)品和輔助產(chǎn)品、材料進(jìn)行復(fù)核查驗(yàn),做好記錄,不合格的決不能使用。
1.4消防工程專業(yè)施工企業(yè)必須從一開始就建立消防工程檔案,健全各種檢驗(yàn)制度。對(duì)防火涂料、防火分隔、消防電氣線路、消防給水管道、防排煙設(shè)施等隱蔽工程都要進(jìn)行過程檢驗(yàn)和最終檢驗(yàn),并且要結(jié)合施工、安裝、調(diào)試、驗(yàn)收等重大程序分階段做好質(zhì)量記錄。消防工程安裝施工完畢但未通過消防驗(yàn)收之前,消防工程專業(yè)施工企業(yè)應(yīng)對(duì)整個(gè)消防系統(tǒng)負(fù)責(zé)。消防驗(yàn)收之后,消防工程專業(yè)施工企業(yè)應(yīng)主動(dòng)向用戶提供有關(guān)消防設(shè)施安裝調(diào)試記錄、開通報(bào)告、隱蔽工程記錄和消防工程使用手冊(cè)等文件資料,切實(shí)履行交接手續(xù)并主動(dòng)做好用戶的后期維護(hù)保養(yǎng)工作。
二、關(guān)于人員的整合能力和消防設(shè)備問題
2.1目前按照建設(shè)部《消防設(shè)施工程專業(yè)承包企業(yè)資質(zhì)等級(jí)標(biāo)準(zhǔn)》(2001年4月)的規(guī)定,專業(yè)消防施工公司在承接建筑工程中消防系統(tǒng)施工時(shí),一般只承接報(bào)警系統(tǒng),緊急廣播系統(tǒng),最多加上水噴淋,消防栓及氣體滅火系統(tǒng)。而其防火排煙、正壓送風(fēng)、防火門、卷簾門以及電源的安裝,則由土建公司或其他水暖公司負(fù)責(zé)施工。如果消防工程專業(yè)施工企業(yè)的主要技術(shù)負(fù)責(zé)人或現(xiàn)場(chǎng)施工負(fù)責(zé)人員,對(duì)整個(gè)工程防災(zāi)系統(tǒng)邏輯功能不具備全面清楚的理解把握,而土建總包方技術(shù)負(fù)責(zé)人或生產(chǎn)計(jì)劃人員又不清楚這些消防聯(lián)動(dòng),往往造成工程最后階段遲遲調(diào)試不完,甚至驗(yàn)收不合格的被動(dòng)局面,有鑒于此,消防工程施工企業(yè)應(yīng)當(dāng)而且必須安排對(duì)整個(gè)防災(zāi)系統(tǒng)且有整合能力的專業(yè)人員進(jìn)行現(xiàn)場(chǎng)管理。
2.2關(guān)于消防設(shè)備,目前個(gè)別消防產(chǎn)品雖然通過了檢驗(yàn),允許進(jìn)入市場(chǎng),能滿足消防的基本功能,但也在工程應(yīng)用過程中暴露出產(chǎn)品標(biāo)準(zhǔn)銜接脫節(jié)、檢測(cè)中心分工脫節(jié)、生產(chǎn)廠商設(shè)計(jì)不完善等深層次的問題。
三、關(guān)于推行“優(yōu)質(zhì)優(yōu)價(jià)”的問題
消防工程專業(yè)施工只有遵循質(zhì)量效益一致的原則,即所謂的“優(yōu)質(zhì)優(yōu)價(jià)”。努力追求消防工程的性價(jià)比,才能形成企業(yè)發(fā)展的良性循環(huán)。為此就要強(qiáng)化管理,向管理要效益,向管理要信譽(yù),而貫徹ISO9000質(zhì)量管理和質(zhì)量保證的標(biāo)準(zhǔn),建立健全消防工程專業(yè)施工企業(yè)質(zhì)量管理體系,無疑是現(xiàn)階段行之有效的途徑。企業(yè)要效益,必須抓管理,必須重培訓(xùn),必須上規(guī)模。
四、關(guān)于規(guī)范市場(chǎng)的問題
4.1隨著建筑市場(chǎng)的開放,中小企業(yè)數(shù)量的不斷增多,對(duì)于消防工程市場(chǎng)起到了積極作用。但同時(shí)由于缺乏有效管理,也造成了市場(chǎng)秩序的混亂。市場(chǎng)競(jìng)爭(zhēng)層次不清,相互競(jìng)相壓價(jià)承包,墊資承包,造成勞動(dòng)生產(chǎn)率和經(jīng)濟(jì)效益的大幅度下降,直接危及工程質(zhì)量。有些企業(yè)拿到訂單后,臨時(shí)拉隊(duì)伍,不經(jīng)專業(yè)技術(shù)培訓(xùn)倉(cāng)促上陣;采購(gòu)設(shè)備不問質(zhì)量,只求價(jià)低;還有個(gè)別企業(yè)賣資質(zhì)證書和許可證書以及轉(zhuǎn)包和掛靠,這些違規(guī)行為在一定意義上對(duì)市場(chǎng)秩序危害更大,應(yīng)予堅(jiān)決整頓冶理,以利規(guī)范消防工程市場(chǎng)。
4.2要實(shí)行消防資質(zhì)動(dòng)態(tài)管理,加大現(xiàn)場(chǎng)稽查力度,隨時(shí)根據(jù)施工企業(yè)進(jìn)入市場(chǎng)的經(jīng)營(yíng)情況和營(yíng)業(yè)范圍進(jìn)行調(diào)整。要切實(shí)把動(dòng)態(tài)管理考核的重點(diǎn)轉(zhuǎn)向工程的質(zhì)量、安全和單位的社會(huì)信譽(yù)上來。通過有升有降的動(dòng)態(tài)管理來推動(dòng)企業(yè)的發(fā)展,促進(jìn)企業(yè)素質(zhì)的提高,同時(shí)對(duì)消防工程實(shí)行備案制度。
4.3消防公司配備足夠合理的人力、物力、財(cái)力等資源,合理構(gòu)架組織機(jī)構(gòu),全面落實(shí)消防工程施工質(zhì)量管理措施。要建立完善并落實(shí)企業(yè)技術(shù)負(fù)責(zé)人、項(xiàng)目負(fù)責(zé)人、施工調(diào)試人員三級(jí)質(zhì)量管理崗位責(zé)任制度。要建立完善企業(yè)內(nèi)部消防設(shè)施施工操作技術(shù)規(guī)程和調(diào)試檢測(cè)規(guī)程;要落實(shí)作業(yè)現(xiàn)場(chǎng)質(zhì)量記錄和工程完工檢驗(yàn)試驗(yàn)制度;要落實(shí)采購(gòu)驗(yàn)收、施工和調(diào)試器具校驗(yàn)、糾正預(yù)防以及內(nèi)部質(zhì)量審核制度等。提高企業(yè)的管理素質(zhì),要針對(duì)項(xiàng)目的特點(diǎn),把重點(diǎn)轉(zhuǎn)移到項(xiàng)目上來,走質(zhì)量效益型的發(fā)展道路。
關(guān)鍵詞:建筑消防;工程施工;問題;處理
中圖分類號(hào):TU998.1 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):
前言
隨著我國(guó)經(jīng)濟(jì)的持續(xù)發(fā)展,人民生活水平的提高,城市現(xiàn)代化的進(jìn)程也在不斷的加快。建筑消防安全作為城市現(xiàn)代化建設(shè)的一個(gè)重要方面,必須要適應(yīng)城市現(xiàn)代化發(fā)展的客觀要求。為此,本文著重論述了建筑消防工程施工中的常見問題與處理措施。
一、建筑消防施工中的常見問題
1.1 防排煙系統(tǒng)存在的問題
1)防煙樓梯間與防煙前室共用正壓送風(fēng)系統(tǒng)的設(shè)計(jì)有缺漏。2)不具備自然排煙條件的封閉樓梯間未采取防煙設(shè)計(jì)。3)長(zhǎng)度超過20 米內(nèi)走道未設(shè)機(jī)械排煙設(shè)施。4)作為自然排煙用途的排煙窗設(shè)置的形式、位置及開窗面積不準(zhǔn)確。5)中庭排煙窗的設(shè)置形式不利于平時(shí)的操作。6)分段后的疏散樓梯間的下段未設(shè)置正壓送風(fēng)系統(tǒng)。7)剪刀樓梯間的正壓送風(fēng)系統(tǒng)未按規(guī)定分別獨(dú)立設(shè)置正壓送風(fēng)系統(tǒng)。8)排煙閥安裝位置不對(duì),合用前室因管理不到位而形同虛設(shè)。
1.2 消防給水管網(wǎng)方面方面存在的問題
1)消防給水管網(wǎng)試壓沒有按施工方案和規(guī)范要求進(jìn)行。2)個(gè)別工程存在將塑料給水管道用于消防給水管道,或者在建筑物內(nèi)塑料給水管道與消防給水管道相連的情況。
1.3 室內(nèi)、外消火栓系統(tǒng)方面存在的問題
1)室內(nèi)消火栓安裝及壓力不符合要求。2)在地下式水泵接合器和地下式室外消火栓的安裝中,未嚴(yán)格按照標(biāo)準(zhǔn)圖集安裝在當(dāng)?shù)貎鐾翆右韵潞褪彝庀鹚ㄋw上未安裝泄水閥。
二、問題產(chǎn)生的原因
2.1 施工隊(duì)伍人員素質(zhì)參差不齊、高低不同
大多數(shù)施工單位只注重經(jīng)濟(jì)效益,對(duì)于建筑工程施工覺得只要基礎(chǔ)、結(jié)構(gòu)等重要方面不出什么問題就可以了,而對(duì)其他建筑安裝工程隨意降低標(biāo)準(zhǔn)。再者,在消防設(shè)施工程施工方面缺少相應(yīng)的人才,無法具備對(duì)消防設(shè)施監(jiān)測(cè)時(shí)運(yùn)用科學(xué)的試驗(yàn)方法,技術(shù)先進(jìn)、性能穩(wěn)定的試驗(yàn)設(shè)備及政治和技術(shù)素質(zhì)好的,熟悉試驗(yàn)方法和試驗(yàn)設(shè)備并經(jīng)過考核合格的試驗(yàn)人員這三個(gè)基本條件,所以對(duì)此類工程的施工只停留于表面,而未作技術(shù)推敲和運(yùn)用科學(xué)、統(tǒng)一的檢測(cè)和試驗(yàn)方法。
2.2 建筑物管理單位對(duì)消防管理工作薄弱、思想麻痹大意
任何消防設(shè)施應(yīng)時(shí)刻保持正常的工作狀態(tài),需要對(duì)系統(tǒng)各組件進(jìn)行經(jīng)常性的維護(hù)管理,以達(dá)到發(fā)生火災(zāi)時(shí)能及時(shí)的控制和撲滅火災(zāi)的目的。但在實(shí)際中這些管理單位未做到應(yīng)有的每日檢查、季度試驗(yàn)和檢查、年度檢查試驗(yàn)和對(duì)火災(zāi)自動(dòng)報(bào)警裝置中的探頭、自動(dòng)噴水滅火系統(tǒng)中的噴頭等消防設(shè)施的專門清洗、消防給水管道沖沙等工作,致使建筑消防設(shè)施自建好后就“一直沉睡”的現(xiàn)象時(shí)有發(fā)生。
2.3 各種管材和設(shè)備質(zhì)量良莠不齊
隨著各地不斷開發(fā)引進(jìn)了各種新型的給排水管材,常見的有:薄壁不銹鋼管、銅管、PVC 管、鋼塑管、PEX管、球墨鑄鐵管和鋁塑復(fù)合管等。新型管道材料的不斷改進(jìn),在施工中以次充好,不了解產(chǎn)品性能的問題日益嚴(yán)峻。另外在消防設(shè)施的施工中,追求設(shè)施設(shè)備的美觀,而未考慮設(shè)備的使用性能、可操作性和產(chǎn)品質(zhì)量,顧此失彼。
2.4 建立健全建筑消防設(shè)施安裝設(shè)計(jì)、施工和驗(yàn)收規(guī)范
現(xiàn)今在施工安裝和監(jiān)督檢查過程中,只能遵循原有的規(guī)范和相關(guān)的行業(yè)標(biāo)準(zhǔn),如《建筑設(shè)計(jì)防火規(guī)范》(GBJ16- 87)、《高層民用建筑設(shè)計(jì)防火規(guī)范》(GB50045- 95)、《自動(dòng)噴水滅火系統(tǒng)設(shè)計(jì)規(guī)范》(GBJ50084- 2001)、《自動(dòng)噴水滅火系統(tǒng)施工及驗(yàn)收規(guī)范》(GB50261- 96)、《建筑給排水設(shè)計(jì)規(guī)范》(GBJ15- 88)、《建筑給水排水及采暖工程施工質(zhì)量驗(yàn)收規(guī)范》(GB50242- 2002)等。
三、處理措施
建筑工程中存在的以上問題,充分暴露出建筑消防系統(tǒng)隱蔽工程安裝、調(diào)試、室內(nèi)裝飾裝修工程不規(guī)范、消防產(chǎn)品質(zhì)量無保障,消防系統(tǒng)總體功能不能滿足規(guī)范要求等問題。為此應(yīng)當(dāng)及時(shí)跟蹤建筑工程消防設(shè)施施工過程,堅(jiān)決杜絕建設(shè)、施工單位不按國(guó)家消防技術(shù)規(guī)范和經(jīng)批準(zhǔn)的施工圖紙施工、擅自降低技術(shù)標(biāo)準(zhǔn)要求、改變消防設(shè)計(jì)等問題的發(fā)生,嚴(yán)厲整治建筑施工違規(guī)違章行為,防止埋下“先天火災(zāi)隱患”。同時(shí)做好以下幾個(gè)方面工作:
3.1 要制定切實(shí)可行的治理措施,突出重點(diǎn),狠抓落實(shí),講求實(shí)效,尤其要注意從“源頭”抓起,杜絕先天火災(zāi)隱患的產(chǎn)生
要督促建設(shè)單位嚴(yán)格履行安全生產(chǎn)職責(zé),加強(qiáng)對(duì)分包單位的管理。從工程設(shè)計(jì)、工程施工、工程監(jiān)理等各個(gè)環(huán)節(jié)嚴(yán)格把關(guān),確保安全,消除各類事故隱患。一是利用多種傳媒手段宣傳消防法律、法規(guī),提高社會(huì)對(duì)消防工作的關(guān)注程度,營(yíng)造社會(huì)“大消防”氛圍;二是政府相關(guān)部門應(yīng)加強(qiáng)聯(lián)系和協(xié)作,使建筑工程在審批階段就開始接受消防部門的監(jiān)督,凡是未經(jīng)消防部門同意建筑工程,其他部門不予辦理相關(guān)手續(xù)。從源頭上杜絕建設(shè)單位不報(bào)審、不驗(yàn)收現(xiàn)象的發(fā)生。三是對(duì)社會(huì)單位的法人代表或負(fù)責(zé)人舉辦消防知識(shí)培訓(xùn)班,重點(diǎn)是《消防法》,《機(jī)關(guān)、團(tuán)體、企業(yè)、事業(yè)單位消防安全管理規(guī)定》的學(xué)習(xí),強(qiáng)化消防安全責(zé)任主體意識(shí),明確應(yīng)履行的職責(zé),讓他們從內(nèi)心上真正重視起消防工作。
3.2 相關(guān)部門應(yīng)加強(qiáng)本地建筑消防工程施工現(xiàn)場(chǎng)的檢查工作
對(duì)有關(guān)建筑安全生產(chǎn)責(zé)任制不落實(shí)、建筑安全管理體制不健全、建筑安全監(jiān)督機(jī)構(gòu)和監(jiān)督人員職責(zé)不明確、建筑施工安裝不嚴(yán)格按照國(guó)家有關(guān)規(guī)定進(jìn)行等問題,要發(fā)現(xiàn)一起,查處一起,徹底扭轉(zhuǎn)建筑消防工程施工管理不嚴(yán)的現(xiàn)象。要加大執(zhí)法力度,對(duì)建筑工程施工現(xiàn)場(chǎng)實(shí)行嚴(yán)管重罰,定期檢查,對(duì)不按圖施工、擅自改變建筑結(jié)構(gòu)、消防設(shè)施的責(zé)令限期改正,逾期不改正的依法停止施工并處以高額罰款,維護(hù)消防法律的嚴(yán)肅性。對(duì)已經(jīng)消防監(jiān)督部門驗(yàn)收通過的建筑工程,要做好日常的消防監(jiān)督檢查,發(fā)現(xiàn)消防設(shè)施、器材損壞的要督促單位抓緊整改,確實(shí)使建筑消防設(shè)施在關(guān)鍵的時(shí)候能發(fā)揮作用。
3.3 大力加強(qiáng)消防設(shè)施檢驗(yàn)中介機(jī)構(gòu)的發(fā)展和各項(xiàng)消防產(chǎn)品的檢驗(yàn)
對(duì)于建筑物中的消防設(shè)施在工程竣工后的驗(yàn)收中,驗(yàn)收人員只能通過眼睛來看,充其量也只是現(xiàn)場(chǎng)做出水測(cè)試,看一下水壓和水量是否合格,無法來做深層次檢測(cè)檢驗(yàn)。這就需要加強(qiáng)消防設(shè)施檢驗(yàn)中介機(jī)構(gòu)的建設(shè)發(fā)展,竣工驗(yàn)收時(shí)可以利用該中介機(jī)構(gòu)強(qiáng)有力的技術(shù)手段和檢驗(yàn)設(shè)備對(duì)建筑物進(jìn)行全方位的科學(xué)檢測(cè),并出具相應(yīng)的檢驗(yàn)報(bào)告,促使建筑物內(nèi)各項(xiàng)消防系統(tǒng)真正發(fā)揮起作用,提高建筑物抗御火災(zāi)能力。另外,對(duì)于建筑物中所使用的消防產(chǎn)品,包括消防設(shè)備和管材,必須提供國(guó)家防火建筑材料質(zhì)量監(jiān)督檢驗(yàn)中心和建筑材料質(zhì)量監(jiān)督檢驗(yàn)中心檢驗(yàn)合格的檢測(cè)報(bào)告,而且該報(bào)告在時(shí)間上應(yīng)與最新通報(bào)的時(shí)間相符。
3.4 注重對(duì)施工從業(yè)人員進(jìn)行有關(guān)安全生產(chǎn)技術(shù)標(biāo)準(zhǔn)、施工現(xiàn)場(chǎng)安全操作等方面的培訓(xùn)
首先應(yīng)加強(qiáng)建筑工地安全生產(chǎn)責(zé)任制度的健全和責(zé)任的落實(shí),規(guī)范安全生產(chǎn)監(jiān)督管理和加大安全防護(hù)的投入,讓施工從業(yè)人員從思想意識(shí)上得到重視。其次行動(dòng)上應(yīng)規(guī)范施工作業(yè),嚴(yán)格按照各項(xiàng)安全操作規(guī)程作業(yè),禁止隨意動(dòng)火、動(dòng)電。加大對(duì)施工單位技術(shù)人員、工程監(jiān)理人員、建設(shè)單位消防安全責(zé)任人、管理人等人員的消防培訓(xùn),使他們成為技術(shù)純熟、消防素質(zhì)高,提高建筑物安全可靠性的行家手里。
關(guān)鍵字:消防;安裝;消火栓系統(tǒng);噴淋系統(tǒng)
Abstract: The quality of fire prevention facilities is closely connected with the operation of these facilities. Hydrant systems and Sprinkler system are the most basic and most important parts of extinguishing installation in structural fire protection.In this paper,to link to the reality we analyzed the issues of fire engineering construction from these two respects.The paper also puts forward a series of opinions for the reference of other enterprises and people who engages in fire
protection.
Key word: Fire Fighting ; Install; Hydrant systems ; Sprinkler system
中圖分類號(hào):D035.36 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):2095-2104(2012)
0引言
建筑消防設(shè)施施工是建筑設(shè)備工程的重要組成部分,是建筑物中一項(xiàng)必不可少的建筑安裝工程。建筑物內(nèi)人口密集,易燃物品眾多,一旦發(fā)生火災(zāi),如果不能及時(shí)撲滅,將會(huì)帶來重大損失。為了防止和減少高層建筑火災(zāi)的危害,保護(hù)人民生命和財(cái)產(chǎn)的安全,國(guó)家陸續(xù)頒布了《自動(dòng)噴水滅火系統(tǒng)施工及驗(yàn)收規(guī)范》(GB50261—2005)、自動(dòng)噴水滅火系統(tǒng)設(shè)計(jì)規(guī)范(GB50084—2005)等一系列規(guī)范規(guī)程,以確保施工質(zhì)量[1-2]。我國(guó)建筑消防應(yīng)用最基本、最重要的兩種形式:一是消火栓滅火系統(tǒng),二是自動(dòng)噴淋滅火系統(tǒng)。這兩種形式也成為影響高層建筑消防系統(tǒng)工程質(zhì)量的主要因素,施工中也往往在這兩個(gè)方面出現(xiàn)消防安裝上的問題最多。所以本文從這兩個(gè)方面對(duì)建筑消防工程施工中一些問題進(jìn)行總結(jié)、分析,同時(shí)給出相應(yīng)的解決對(duì)策,為廣大建筑消防工程施工企業(yè)及廣大消防從業(yè)人員提供參考。
1消防安裝施工中常見的問題
1.1消火栓系統(tǒng):
(1)消火栓系統(tǒng)管道、水泵等設(shè)備施工不規(guī)范,以至后來的消火栓試射試驗(yàn)不達(dá)標(biāo),實(shí)際噴水高度達(dá)不到設(shè)計(jì)要求高度,為消防安全埋下了隱患。
(2)有些施工單位隨意更改消火栓箱底預(yù)留孔位置,而且用氣焊割孔,導(dǎo)致安裝后,栓口出水方向不能與設(shè)置消火栓的墻面成90°角;或者與周圍距離過小,造成消防水帶不能安裝至消火栓上或使水帶彎折,影響出水量[3]。
(3)對(duì)于建筑面積大、結(jié)構(gòu)功能復(fù)雜的建筑物,施工過程中一般都以滿足了最不利點(diǎn)的消火栓水壓要求為出發(fā)點(diǎn),而忽視了次不利點(diǎn)消火栓水壓要求,沒有
做到滿足所有點(diǎn)的壓力要求。火災(zāi)發(fā)生時(shí),容易造成預(yù)想不到的危害。所以,為
_____________________________
作者介紹:龐小平(1984- ),女,內(nèi)蒙古人,碩士,助理工程師 E-mail:
了增強(qiáng)此類建筑物消防給水的供水可靠性,應(yīng)在滿足最不利點(diǎn)消火栓水壓要求的同時(shí),還應(yīng)考慮次不利點(diǎn)消火栓水壓要求。
(4)消火栓箱及其附件出現(xiàn)問題。一是消防栓口安裝在門軸側(cè);消火栓箱門的鋁合金邊框,阻擋消火帶卡口與消火栓口連接;二是在二次裝修過程中消火栓箱被裝飾物遮掩,箱門四周的裝修材料顏色未與箱門的顏色有明顯區(qū)別;三是消防水帶與接口隨意扎接,接口處未安裝卡簧,導(dǎo)致試水時(shí)接口和水帶脫落。
(5)在地下式水泵接合器和地下式室外消火栓的安裝中,未嚴(yán)格按照標(biāo)準(zhǔn)圖集安裝在當(dāng)?shù)貎鐾翆右韵潞褪彝庀鹚ㄋw上安裝泄水閥。另外,因施工人員麻痹大意往往將地下式水泵接合器和地下式室外消火栓混淆,概念不清,造成兩種功能作用不同的設(shè)施相反安裝或重復(fù)安裝[4]。
(6)與土建配合不到位,有些暗敷在磚墻內(nèi)的消火栓箱洞口上部不設(shè)置過梁或者過梁設(shè)置不合理,土建補(bǔ)洞時(shí),擠加磚塊,受荷載作用箱體變形,導(dǎo)致消火栓箱門開啟不靈或者根本安裝不上。
(7)消防給水系統(tǒng)主干管道須按照施工驗(yàn)收規(guī)范設(shè)置3‰的坡度,并在利于排水的區(qū)域設(shè)置排水管,實(shí)際施工過程中大多由于操作困難等因素而忽略了坡度和排水管,造成管道系統(tǒng)集氣和系統(tǒng)試驗(yàn)時(shí)無法排水的困難。
1.2自動(dòng)噴淋系統(tǒng)
(1)有時(shí)為了照顧裝飾,施工中隨意更改感溫噴頭的位置,導(dǎo)致感溫噴頭與周圍物體的距離不符合規(guī)范要求,超出噴頭的保護(hù)半徑,火災(zāi)發(fā)生時(shí),由于噴頭與樓板距離太遠(yuǎn),感溫元件不能及時(shí)動(dòng)作,從而延誤噴水時(shí)間,使火勢(shì)蔓延迅速;或者噴頭距周圍物體太近,致使噴頭噴灑不到其保護(hù)范圍而造成嚴(yán)重隱患。
(2)自噴給水系統(tǒng)管道閥門設(shè)置不合理,支吊架設(shè)置不規(guī)范,對(duì)吊頂內(nèi)管道系統(tǒng)的閥門等檢修、控制裝置未設(shè)置檢修口或檢修口位置設(shè)置不合理,加大了實(shí)際操作、檢驗(yàn)難度,并給工程維修帶來諸多不便。噴頭安裝時(shí),不使用專用板手,利用噴頭的框架施擰,經(jīng)常損壞噴頭,影響工程質(zhì)量。
(3)報(bào)警閥組及水力警鈴,水流指示器,信號(hào)閥,節(jié)流裝置等其他組件的選材、選型和安裝不符合設(shè)計(jì)和規(guī)范要求。有些水力警鈴未設(shè)置在公共通道或值班室的外墻上。當(dāng)使用場(chǎng)所發(fā)生火災(zāi),自動(dòng)噴水滅火系統(tǒng)啟動(dòng)后,所發(fā)生的報(bào)警聲響不能被相關(guān)人員及時(shí)察覺,造成不必要的損失和傷亡,而且火災(zāi)撲滅后不易于維修檢查。
(4)由于設(shè)計(jì)考慮欠周詳,部分工程噴淋系統(tǒng)甚至未設(shè)置末端試水裝置,有些工程噴淋系統(tǒng)的末端試水裝置安裝在公共走廊處,附近沒有排水管或地漏等排水設(shè)施。在試驗(yàn)或相關(guān)人員檢查時(shí),管網(wǎng)系統(tǒng)中流出的水無法從排水系統(tǒng)中迅速排走,破壞周圍環(huán)境。
(5)屋頂消防水箱的安裝不符合要求。消防用水與其他用水合并的水箱,施工時(shí)經(jīng)常忽視和未做消防用水的技術(shù)措施,無法滿足消防水箱應(yīng)儲(chǔ)存10min的消防用水量的規(guī)范要求。另外隨意改變消防給水管的位置,不設(shè)置逆止閥,在給水管道上加設(shè)不必要的閥門和本來一備一用的消防給水管只設(shè)置一個(gè),導(dǎo)致安裝后,無法保證正常消防用水量或發(fā)生火災(zāi)時(shí)水箱不能及時(shí)供水。
(6)當(dāng)建筑的通風(fēng)管道寬度大于1.2米時(shí),噴頭未布置安裝在通風(fēng)管腹面以下。在涂刷、粉飾天花板時(shí),將涂料噴灑在噴頭上。當(dāng)發(fā)生火災(zāi)時(shí),系統(tǒng)不能及時(shí)動(dòng)作或縮小了保護(hù)的范圍[5]。
2消防安裝施工中諸多問題的根源
(一)、消防供水設(shè)施的安裝施工
1、消防水泵及穩(wěn)壓泵的安裝
消防水泵安裝工藝:施工準(zhǔn)備→基礎(chǔ)施工→泵體安裝→吸水管路安裝→出水管路安裝→單機(jī)調(diào)試。
(1).水泵安裝:消防水泵、穩(wěn)壓泵的安裝,應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)《機(jī)械設(shè)備安裝工程施工及驗(yàn)收通用規(guī)范》及《壓縮機(jī)、風(fēng)機(jī)、泵安裝工程施工及驗(yàn)收規(guī)范》的有關(guān)規(guī)定。
檢查泵的安裝基礎(chǔ)的尺寸、位置和標(biāo)高均符合工程設(shè)計(jì)要求。
泵的開箱檢查應(yīng)符合下列要求:應(yīng)按設(shè)備技術(shù)文件的規(guī)定清點(diǎn)泵的零件和部件,并應(yīng)無缺件、損壞和銹蝕等;管口保護(hù)物和堵蓋應(yīng)完好;應(yīng)核對(duì)泵的主要安裝尺寸并應(yīng)與工程設(shè)計(jì)相符。
出廠時(shí)已裝配、調(diào)整完善的部分不得拆卸。
電動(dòng)機(jī)與泵連接時(shí),應(yīng)以泵的軸線為基準(zhǔn)找正;電動(dòng)機(jī)與泵之間有中間機(jī)器連接時(shí),應(yīng)以中間機(jī)器軸線為基準(zhǔn)找正。
水泵安裝允許偏差
室內(nèi)給水設(shè)備安裝的允許偏差
項(xiàng)次項(xiàng)目允許偏差(mm)
1靜置設(shè)備坐標(biāo)15
標(biāo)高±5
垂直度(每米)5
2離心式水泵立式泵體垂直度(每米)0.1
臥式泵體水平度(每米)0.1
聯(lián)軸器同心度軸向傾斜
(每米)0.8
徑向位移0.1
(2).吸水管的安裝
水泵吸水管路的基本要求是不漏氣、不積氣、不吸氣。
當(dāng)消防水泵和消防水池位于獨(dú)立的兩個(gè)基礎(chǔ)上,且相互為剛性連接時(shí),吸水管上應(yīng)加設(shè)柔性連接管。
吸水管水平管段上不應(yīng)有氣囊和漏氣現(xiàn)象。
關(guān)鍵詞: 消防工程 施工問題 控制
中圖分類號(hào):TU998.1 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):
前言
消防工程施工是整體建筑施工中的最特殊也是重要組成部分, 是建筑物中一項(xiàng)必不可少的安裝工程。隨著建筑物的高度和廣度的不斷增加, 人們生活水平的不斷提高, 對(duì)消防工程的安全性及建筑物抗御火災(zāi)能力等方面提出了更高的要求, 這些除了在設(shè)計(jì)和材料設(shè)備選擇等方面加強(qiáng)外, 更需要施工安裝質(zhì)量的保證。施工質(zhì)量的好壞, 將直接影響著建筑消防設(shè)施的正常運(yùn)行。
一、消防工程施工的常見問題
1消防給水管網(wǎng)
消防給水管網(wǎng)試壓沒有按施工方案和規(guī)范要求進(jìn)行。管網(wǎng)試壓分試漏檢修和強(qiáng)度試驗(yàn)兩步進(jìn)行。試漏是在常壓或稍起壓狀態(tài)下進(jìn)行,而強(qiáng)度試驗(yàn)分工作壓力和試驗(yàn)壓力兩階段進(jìn)行。目前有些工地只對(duì)管網(wǎng)進(jìn)行試漏試驗(yàn)或試驗(yàn)壓力不符合設(shè)計(jì)和規(guī)范要求, 這樣給系統(tǒng)的正常運(yùn)行帶來了隱患。按照規(guī)范的要求, 管網(wǎng)安裝完畢后, 應(yīng)進(jìn)行強(qiáng)度試驗(yàn)和嚴(yán)密性試驗(yàn)。對(duì)于消防給水管道, 試驗(yàn)壓力為管道工作壓力的1.5倍, 并且不小于0.6MPa。強(qiáng)度試驗(yàn)是管網(wǎng)在實(shí)驗(yàn)壓力下10min, 壓力降不大于0.05 MPa 為合格。然后將試驗(yàn)壓力緩慢降至工作壓力, 經(jīng)檢查無滲漏, 則嚴(yán)密性試驗(yàn)為合格。對(duì)于自動(dòng)噴淋滅火系統(tǒng)。當(dāng)設(shè)計(jì)工作壓力≤1.0 MPa 時(shí), 水壓強(qiáng)度試驗(yàn)壓力為設(shè)計(jì)工作壓力的1.5 倍, 并且不低于1.4MPa; 當(dāng)設(shè)計(jì)壓力> 1.0MPa 時(shí), 水壓強(qiáng)度試驗(yàn)壓力應(yīng)為該工作壓力加0.4MPa。水壓強(qiáng)度試驗(yàn)是管網(wǎng)在實(shí)驗(yàn)壓力下穩(wěn)定30min, 壓力降不大于0.05MPa 為合格。而水壓嚴(yán)密性試驗(yàn)應(yīng)在水壓強(qiáng)度試驗(yàn)和管網(wǎng)沖洗合格后進(jìn)行, 試驗(yàn)壓力應(yīng)為設(shè)計(jì)工作壓力, 穩(wěn)壓24h, 無泄漏為合格。
2室內(nèi)、外消火栓系統(tǒng)
(1) 室內(nèi)消火栓安裝及壓力不符合要求。一是有些暗敷在磚墻內(nèi)的消火栓箱洞口上部無設(shè)置過梁, 受荷載作用下箱體變形, 導(dǎo)致箱門開啟不靈。二是隨意改變消火栓箱底預(yù)留孔位置, 而且用氣焊割孔, 導(dǎo)致安裝后, 栓口出水方向不能與設(shè)置消火栓的墻面成90°角; 或者與周圍距離過小, 造成消防水帶不能安裝至消火栓上或使水帶形成彎折影響出水量。三是對(duì)于建筑面積大、結(jié)構(gòu)功能復(fù)雜的建筑物雖只滿足了最不利點(diǎn)消火栓水壓要求, 而忽視了次不利點(diǎn)消火栓水壓要求。為增強(qiáng)此類建筑物消防給水的供水可靠性, 應(yīng)在滿足最不利點(diǎn)消火栓水壓要求的同時(shí), 還應(yīng)考慮次不利點(diǎn)消火栓水壓要求。
(2)在水泵接合器和室外消火栓的安裝中, 未嚴(yán)格按照標(biāo)準(zhǔn)圖集安裝。另外因施工人員麻痹大意往往將水泵接合器和室外消火栓混淆, 概念不清, 造成兩種功能作用不同的設(shè)施相反安裝或重復(fù)安裝。
(3) 消火栓箱及其附件出現(xiàn)問題。一是在二次裝修過程中消火栓箱被裝飾物遮掩, 箱門四周的裝修材料顏色未與箱門的顏色有明顯區(qū)別; 二是消防水帶與接口隨意扎接, 接口處未安裝卡簧, 導(dǎo)致試水時(shí)接口和水帶脫落。
3自動(dòng)噴水滅火系統(tǒng)
(1)《自動(dòng)噴水滅火系統(tǒng)施工與驗(yàn)收規(guī)范》中明確規(guī)定: 管網(wǎng)安裝,當(dāng)管子公稱直徑小于或等于100mm 時(shí), 應(yīng)采用螺紋連接, 當(dāng)管子公稱直徑大于100mm 時(shí), 可采用焊接或法蘭連接, 當(dāng)管子公稱直徑等于或大于50mm 時(shí), 每段配水干管或配水管設(shè)置防晃支架不應(yīng)小于1 個(gè);當(dāng)管道改變方向時(shí), 應(yīng)增設(shè)防晃支架。而在實(shí)際工程中, 為施工方便,公稱直徑小于100mm 的管道經(jīng)常采用焊接, 大部分的工程管道不安裝防晃支架。
(2) 感溫噴頭與周圍物體的距離不符合規(guī)范要求, 造成火災(zāi)時(shí)由于噴頭與樓板距離太遠(yuǎn), 感溫元件不能及時(shí)動(dòng)作, 延誤噴水時(shí)間而使火勢(shì)蔓延迅速; 或者噴頭距周圍物體太近, 而使消防用水噴灑不到其保護(hù)范圍的隱患存在。
(3) 由于設(shè)計(jì)考慮欠周詳, 部分工程噴淋系統(tǒng)甚至未設(shè)置末端試水裝置, 部分工程噴淋系統(tǒng)的末端試水裝置安裝在公共走廊處, 附近沒有排水管或地漏, 造成在監(jiān)督檢查時(shí)無法試壓或在試壓過程中流出的水無法從排水系統(tǒng)中迅速排走。
(4) 當(dāng)風(fēng)管道寬度大于1.2 米時(shí), 噴頭未布置安裝在風(fēng)管腹面以下, 并且在涂刷、粉飾天花時(shí), 將涂料噴灑在噴頭上。造成當(dāng)發(fā)生火災(zāi)時(shí), 系統(tǒng)不能及時(shí)動(dòng)作或縮小了保護(hù)范圍。
(5) 水力警鈴未設(shè)置在公共通道或值班室的外墻上。當(dāng)發(fā)生火災(zāi),自動(dòng)噴水滅火系統(tǒng)啟動(dòng)后, 所發(fā)出的報(bào)警聲響不能被值班人員或保護(hù)場(chǎng)所內(nèi)其他人員及時(shí)發(fā)現(xiàn), 貽誤戰(zhàn)機(jī), 造成不必要財(cái)產(chǎn)損失和人員傷亡, 而且火災(zāi)撲滅后不方便關(guān)閉水源控制閥和維修檢查。
(6) 屋頂消防水箱的安裝不符合要求。消防用水與其他用水合并的水箱, 施工時(shí)經(jīng)常忽視和未做消防用水不作他用的技術(shù)設(shè)施, 無法滿足消防水箱應(yīng)儲(chǔ)存10min 的消防用水量的規(guī)范要求。另外隨意改變消防給水管的位置, 未設(shè)置逆止閥, 在給水管道上加設(shè)不必要的閥門和本來一備一用的消防給水管只設(shè)置一個(gè), 導(dǎo)致安裝后, 無法保證正常消防用水量或發(fā)生火災(zāi)時(shí)水箱不能及時(shí)給足消防供水,影響火情的前期控制。
二、問題的解決方法
以上存在的問題,充分暴露出消防系統(tǒng)隱蔽工程安裝、調(diào)試、室內(nèi)工程不規(guī)范、消防產(chǎn)品質(zhì)量無保障,消防系統(tǒng)總體功能不能滿足規(guī)范要求等問題。為此應(yīng)當(dāng)及時(shí)跟蹤工程消防設(shè)施施工過程,堅(jiān)決杜絕建設(shè)、施工單位不按國(guó)家消防技術(shù)規(guī)范和經(jīng)批準(zhǔn)的施工圖紙施工、擅自降低技術(shù)標(biāo)準(zhǔn)要求、改變消防設(shè)計(jì)等問題的發(fā)生,嚴(yán)厲整治建筑施工違規(guī)違章行為,防止埋下“先天火災(zāi)隱患”。同時(shí)做好以下幾個(gè)方面工作:
1 要制定切實(shí)可行的治理措施,突出重點(diǎn),狠抓落實(shí),講求實(shí)效,尤其要注意從“源頭”抓起,杜絕先天火災(zāi)隱患的產(chǎn)生要督促建設(shè)單位嚴(yán)格履行安全生產(chǎn)職責(zé),加強(qiáng)對(duì)分包單位的管理。從工程設(shè)計(jì)、工程施工、工程監(jiān)理等各個(gè)環(huán)節(jié)嚴(yán)格把關(guān), 確保安全, 消除各類事故隱患。一是利用多種傳媒手段宣傳消防法律、法規(guī), 提高社會(huì)對(duì)消防工作的關(guān)注程度,營(yíng)造社會(huì)" 大消防"氛圍;二是政府相關(guān)部門應(yīng)加強(qiáng)聯(lián)系和協(xié)作,使建筑工程在審批階段就開始接受消防部門的監(jiān)督,凡是未經(jīng)消防部門同意建筑工程,其他部門不予辦理相關(guān)手續(xù)。從源頭上杜絕建設(shè)單位不報(bào)審、不驗(yàn)收現(xiàn)象的發(fā)生。三是對(duì)社會(huì)單位的法人代表或負(fù)責(zé)人舉辦消防知識(shí)培訓(xùn)班,重點(diǎn)是《消防法》, 《機(jī)關(guān)、團(tuán)體、企業(yè)、事業(yè)單位消防安全管理規(guī)定》的學(xué)習(xí), 強(qiáng)化消防安全責(zé)任主體意識(shí),明確應(yīng)履行的職責(zé),讓他們從內(nèi)心上真正重視起消防工作。
2 相關(guān)部門應(yīng)加強(qiáng)本地建筑消防工程施工現(xiàn)場(chǎng)的檢查工作
對(duì)有關(guān)建筑安全生產(chǎn)責(zé)任制不落實(shí)、建筑安全管理體制不健全、建筑安全監(jiān)督機(jī)構(gòu)和監(jiān)督人員職責(zé)不明確、建筑施工安裝不嚴(yán)格按照國(guó)家有關(guān)規(guī)定進(jìn)行等問題, 要發(fā)現(xiàn)一起,查處一起,徹底扭轉(zhuǎn)建筑消防工程施工管理不嚴(yán)的現(xiàn)象。要加大執(zhí)法力度, 對(duì)建筑工程施工現(xiàn)場(chǎng)實(shí)行嚴(yán)管重罰,定期檢查,對(duì)不按圖施工、擅自改變建筑結(jié)構(gòu)、消防設(shè)施的責(zé)令限期改正,逾期不改正的依法停止施工并處以高額罰款, 維護(hù)消防法律的嚴(yán)肅性。對(duì)已經(jīng)消防監(jiān)督部門驗(yàn)收通過的建筑工程,要做好日常的消防監(jiān)督檢查, 發(fā)現(xiàn)消防設(shè)施、器材損壞的要督促單位抓緊整改,確實(shí)使建筑消防設(shè)施在關(guān)鍵的時(shí)候能發(fā)揮作用。
結(jié)束語(yǔ)
隨著建筑消防施工技術(shù)的不斷完善和發(fā)展,人們對(duì)建筑消防施工質(zhì)量提出更高的要求。但是在建筑消防施工過程中,仍然存在很多問題,如,消火栓安裝不合理;給水管網(wǎng)密封性較差,壓力不符合要求;自動(dòng)噴水系統(tǒng)安裝不規(guī)范等,對(duì)建筑消防施工質(zhì)量造成嚴(yán)重影響,導(dǎo)致建筑消防功能無法發(fā)揮應(yīng)有作用。因此,要求施工單位要對(duì)建筑消防施工圖紙、施工材料、施工設(shè)備及施工質(zhì)量等,進(jìn)行有效的管理和控制,以保證建筑消防施工質(zhì)量,提高建筑消防能力。
參考文獻(xiàn)
[1] 楊達(dá)元.談消防工程施工質(zhì)量監(jiān)理措施[J]. 廣東科技. 2013(06)
[2] 陶華寧.淺談消防施工質(zhì)量監(jiān)理措施[J]. 現(xiàn)代交際. 2013(02)